Foundation pit collapse caused 1 death! Three people were prosecuted! The construction worker wechat group repeatedly asked to stop work and

Failure to properly perform work responsibilities, failure to organize foundation pit excavation and other problems under the condition of no special construction scheme, no education and training for operators and no safety technical disclosure, and being responsible for leading the accident.

At about 16:50, Shang mouchun and Xu mouyang continued to enter the foundation pit for the replacement of the second section of pipe.

(2) Chen, male, 59, is the legal representative of the labor service company.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

1.

7.

At about 17:00, the south side of the foundation pit suddenly collapsed.

It is suggested that China * Shanghai Airlines should deal with it in accordance with the company’s management regulations.

The same foundation pit collapsed.

It is suggested to investigate the criminal responsible personnel.

Sun Mou, male, 40 years old, the chief supervision engineer of the project of the supervision unit, failed to correctly perform his work responsibilities, failed to formulate a practical and effective supervision work plan according to the characteristics of “many points and wide areas” of the project, failed to observe the problems such as the failure to find and stop the violations of the construction unit in time, and was responsible for leading the occurrence of the accident.

Cai Moujun, male, 46 years old, the subcontractor, the person in charge of the comprehensive treatment project of water environment in the third flood control area of Yancheng City, did not correctly perform his duties, did not organize the preparation of special construction scheme for the company’s foundation pit excavation, did not carry out education and training for operators, and did not carry out safety technical disclosure, Failure to assign full-time safety production management personnel to conduct on-site supervision on the construction operation of dangerous and large projects, and other problems are not managed in place, and they bear the main leadership responsibility for the occurrence of accidents.

It is suggested that the Municipal Bureau of housing and urban rural development deal with it according to law.

At the same time, he sent a picture of Excavator Construction in the mobile wechat group and reminded Shao and Wu of the subcontractors to “excavate greening with Xuehai road excavators and bear the consequences when digging pipelines”.

Wu asked Cheng to stop construction.

5.

At about 15:45, when Yang moufei, a construction worker, was patrolling other points, he found that team J-10 was using excavators to excavate earth trenches when he passed Xuehai Road, and immediately asked him to stop the construction.

3.

After replacing the first section of pipe, they returned to the ground to rest and the excavator cleaned the foundation pit.

In the morning of June 4, 2021, Cheng arranged Shang mouchun, Xu mouyang and others to the construction site of well w67-w68 pipeline on Xuehai Road (West Ring Road East trunk canal) to clean the green belt above the excavated pipeline.

As it is suspected to constitute a crime, it is suggested that the public security organ should further file a case for investigation.

Shang mouchun was completely buried by the soil, and Xu mouyang was buried to his waist.

At 9:10, the photo and the information “there are still construction personnel at the bottom of the foundation pit, and the personnel shall be evacuated immediately to take measures” were released..

Shao Mou, male, 34 years old, safety officer of the subcontractor, failed to correctly perform his duties, participated in the organization and implementation of foundation pit excavation and pipe replacement without special construction scheme and safety technical disclosure by the construction personnel, and failed to report the safety activities and construction conditions of the construction organization team of well w67-w68 pipeline on Xuehai Road (West Ring Road East trunk canal) to China * Shanghai Airlines, Bear the main responsibility for the accident.

At 9:04 on December 27, Chen Moujun, the safety officer of the project Department of plot 18 – 03 of the general contractor, released photos and information of “the south side of the reinforcement shed needs to be sloped to reduce the height, and there is a risk of collapse in the stacking of materials” in the wechat group named “qibaowan * project group”.

As it is suspected to constitute a crime, it is suggested that the public security organ should further file a case for investigation.

2.

The same reminder in wechat group before the incident still failed to stop the tragedy.

A few days before the accident, the supervisor and the Construction Party pointed out the risk of collapse in the wechat group for many times, and then did not take effective measures.

As it is suspected to constitute a crime, it is suggested that the public security organ should further file a case for investigation.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

Seeing that there was no reply, Yang moufei called Wu to enter the site, made the on-site safety production and civilized construction inspection form, and asked him to sign and leave the site.

At the commercial project site of plot 18-03 in Qibao ecological business district, Shanghai, a local earthwork collapse accident occurred in the foundation pit, killing 3 people.

Yang moufei, male, 26 years old, is the constructor of the comprehensive treatment project of water environment in Yancheng III flood control area, the general contractor.

At about 15 pm, Cheng rented a Xinyuan brand 75 excavator to start earthwork excavation.

4.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

2.

In the absence of special construction scheme and safety technical disclosure by the construction personnel, he arranged personnel to carry out foundation pit excavation and pipe replacement, failed to implement the shutdown instruction issued by the general contractor, and was mainly responsible for the accident.

At about 17:00 on June 4, 2021, a foundation pit collapse accident occurred during the construction of bid section II of PPP project for comprehensive treatment of water environment (including treatment of black and odorous water bodies) in Yancheng III flood control area, located in the south of Xuehai Road, Yancheng high tech Zone and the west of the north gate of big data Industrial Park, resulting in one death and direct economic loss of 2.347 million yuan.

The tragedy happened.

At 15:24 on December 25, Feng mouyang, the safety supervisor of the project Department of plot 18 – 03 of the supervision unit, released the photos of the north slope of Building 5 and the information of “how does anyone arrange to deal with the large drop between the upper and lower slopes” in the wechat group named “safety and quality of plot 18 – 03”.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

After the foundation pit (about 4m long, 2.5m wide and 3M deep) is excavated in place.

Shortly after Wu left the site, the site continued to start construction.

Wu moujin, male, 24 years old, on-site coordinator of the subcontractor, failed to correctly perform his work responsibilities.

Yu Mou, male, 47 years old, general manager of Yancheng water environment company, failed to correctly perform his work responsibilities, failed to strictly perform the project construction procedures, failed to coordinate and manage the safety production work of the construction unit in place, and was responsible for leading the occurrence of accidents.

Extended reading of the accident reminded Xiaobian of an accident in Shanghai.

He did not correctly perform his duties, the safety management on the operation site was not in place, and the construction unit jinyechen company did not effectively stop the construction in violation of rules and regulations, and took secondary responsibility for the occurrence of the accident.

Round Bar Ferrule

3.

Li Mou, male, 38 years old, the project manager of Yancheng, the general contractor, failed to correctly perform his duties, failed to coordinate and manage the safety production work on the company’s construction site, and was responsible for leading the occurrence of the accident.

Cheng, female, aged 55, was established as the head of team J-10 of the labor company.

6.

In the absence of special construction scheme and safety technical disclosure by the construction personnel, he organized and implemented the foundation pit excavation and pipe replacement operation, failed to implement the shutdown order issued by the general contractor, and was mainly responsible for the accident.

Wang mouzhi, male, 49 years old, the legal representative and general manager of the subcontractor, failed to correctly perform his duties, failed to manage the water environment comprehensive treatment project department in the third flood control area of Yancheng City, failed to supervise the company’s safe production, and took important leadership responsibility for the accident.

It is suggested that Yancheng Emergency Management Bureau should impose administrative punishment on them.

Direct cause in the process of foundation pit excavation, the construction operation management personnel gave commands against rules, the operators carried out blind construction and risky operation, the construction operators worked in the foundation pit (about 3M deep) without taking slope protection and other effective safety measures to prevent collapse, and the earthwork on the south side of the foundation pit collapsed, resulting in accidents.

Shang mouchun and Xu mouyang entered the foundation pit to replace the pipe.

2.

On December 2, Yancheng Emergency Management Bureau released an investigation report on a foundation pit collapse accident.

Seeing that the workers stopped construction, packed up labor tools and left the scene.

According to the investigation report, the manager of the project department, the person in charge of the site and the supervisor were investigated for criminal responsibility.