From now on, closed construction! A total of 30 days!

The North-South two-way construction takes 15 days respectively, and the whole construction period of the closed section is 30 days.

At the same time, g0421 Xuguang Expressway newly opened a north-south two-way control point for the hub to divert vehicles preparing to transfer to G4 Beijing, Hong Kong and Macao simultaneously.

◆   Diversion line 2: turn right at Jinwu hub → g56 hangrui Expressway → turn right at Gongcheng hub → g0421 Xuguang (s61 Yuelin) Expressway goes south.

For specific traffic control information, please pay attention to the road condition information at any time and plan the travel path in advance! During road construction, passing vehicles and pedestrians shall abide by traffic signs and marking instructions, obey the command of on-site personnel on duty, choose the road in advance, pay attention to traffic safety, and read the recommendations= ͟͟͞͞ Cold= ͟͟͞͞ Cold= ͟͟͞͞ Cold= ͟͟͞͞ Cold= ͟͟͞͞ Cold= ͟͟͞͞! The coldest morning is tomorrow! Are you wearing autumn pants? Move in! Show up! Netizen: Mr.

Wang Yaping’s hairstyle comes from Yang Qianjie, editor of Hunan traffic channel, and Huang Huiying, director on duty, lit up for more people to see..

It is closed at Jinwu hub from north to south, and the diversion route is as follows: ◆ 2   Diversion line 1: turn left at Jinwu hub → g56 hangrui Expressway → turn right at Tongcheng West hub → g0422 Wushen (S11 pingru) Expressway goes south.

After the construction from north to south, the construction from south to North will continue.

At present, warning signs, prompt signs, traffic cones, water horses, linear guidance signs and flash lights for diversion are all in place.

Fixing Socket Waved End Nail Plate

The detailed diversion route is as follows: from October 16 to October 30, 1355km (Jinwu hub) to 1484km (yangzichong hub) from north to South are closed for construction, and the traffic from south to north is normal.

The pavement medium repair adopts the organization mode of half closed construction and half normal traffic.

◆   Vehicles from Hubei to the South can bypass g0421 Wuhan Shenzhen Expressway at Chibi West hub in advance.

Attention, car owners! Starting from 15:00 today (October 16), the medium maintenance construction of Yueyang Changsha section k1355-k1484 (Jinwu hub to yangzichong hub) of G4 Beijing Hong Kong Macao Expressway officially began.