Hinder the construction of high-speed railway, you have no discussion!

If the behavior is extreme and even disturbs the office order of the unit, it is not conducive to solving the problem, but also disturbs the normal social order and damages the legitimate rights and interests of others, it will be punished by the law! Laizhou Public Security Bureau is original and cannot be used without authorization.

Cheng is a major livelihood project.

▶ Case 1: from November 26 to 29, Wang Mouguang (male, 49 years old) dissatisfied with the distribution scheme of compensation for land acquisition of high-speed railway adopted by the village committee and voted by the villagers’ representatives, the road at the construction section of Zhuma village, Shahe Town, Weiyan high-speed railway project was blocked by driving, filling soil, stone and dead tree branches for many times, resulting in the impassability of engineering vehicles and tank cars and disturbing the normal construction order of high-speed railway.

Wire Lifting Loop

The public security organ will also resolutely crack down on all kinds of illegal and criminal acts that interfere with the construction of national key projects.

After the completion of the project, Laizhou will enter the “high-speed rail era”! In order to ensure the smooth progress of the construction project of Weizhou Yantai high speed railway (Laizhou section), Laizhou public security severely cracked down on illegal and criminal acts hindering the construction of the project.

In the forenoon of December 1st, the suspect, Wu Xiang, was arrested in accordance with the law.

Citizens shall consciously abide by state laws and regulations and express their demands through legal channels.

On November 30, The perpetrator Wang Mouguang was administratively detained for five days according to law for disturbing the order of the unit.

▶ Case 2: at about 19:30 on November 27, at the construction site of Weiyan high speed railway in Wujia village, Shahe Town, Wu Mouxiang The high speed rail high speed rail forenoon construction was the reason why the 61 year old man broke the construction of the irregular stone with a length of about 40 centimeters.

The drill was shut down and the construction of the high-speed rail project was resumed until the morning of November 29th.

Weiyang Yantai high-speed railway is an important part of the national high-speed railway around the Bohai Sea and a major livelihood project for the benefit of future generations.