Mobilization of plates, carpentry construction and completion of carpentry (on-site acceptance by the owner) 4.
If it is a fully contracted project, take the landlord to the designated merchant to select materials – make a budget after determining the plan – making an appointment with the customer to determine the budget – collecting the decoration deposit – making the effect drawing – making an appointment with the customer to determine the final construction scheme and sign on the construction drawing and effect drawing – signing the contract Commencement and mobilization designers, engineering supervisors, workers and landlords all enter the site for commencement ceremony – designers disclose and arrange wall smashing and water and electricity positioning – hydroelectricians enter the site for construction after the wall smashing project is completed – if the balcony of the turnkey project is sealed, notify the merchant for on-site measurement; if it does not include notifying the owner to arrange measurement – drilling air conditioning holes and air holes – water and electricity are accepted by the owner and signed for confirmation The planner plans the water and electricity circuit diagram and submits it to the owner – the ceiling carpenter enters the site – the designer provides the ceiling carpenter construction drawing – the landlord accepts and confirms the completion of ceiling construction – the bricklayer enters the site – Waterproof – waterproof acceptance (the owner contacts the property to check the waterproof results) ——If there are drawings provided by the designer of modeling tiles – completion of bricklaying – notify the owner for acceptance and confirmation – floor tile protection works – measure doors and windows, cabinets, integrated ceiling, windowsill stone, kitchen and sanitary ware, etc.
Advantages: most of the main materials can be purchased at ease, and the auxiliary materials don’t have to worry.
After the mobilization and commencement of construction, the customer, designer and project manager shall conduct on-site disclosure, issue specific renderings and construction drawings, enter the construction stage, and the customer shall confirm the drawings and sign for approval of the construction project.
In the middle of construction 1.
The project settlement shall be settled according to the actual quantities of the project, and the customer shall submit the decoration balance.
Adhering to the purpose of “being honest and good at painting”, the attitude of “being meticulous and striving for perfection”, the style of “words must be done and deeds must be fruit”, and the long-term development plan of “being pragmatic and realistic”, we are professional, dedicated and focused..
Make an appointment with the customer to measure the room on site.
It is applicable to the crowd: most decoration owners pay more attention to the quality of style products.
After each free room measurement, do a good job in the budget quotation and specify it in detail, so that customers can really understand the expenditure of each expense.
Specific decoration process: customer consultation, initial contact with customers, establish customer data, preliminarily communicate with designers, explain the location, size, house type, desired decoration style, required decoration items, and preliminarily provide the decoration budget price.
2.
When it comes to decoration, I don’t know where to start, what materials to buy, how to find a decoration company, and which construction team is better? Don’t worry about what problems are prone to occur in the decoration.
Huaibei chengyijia decoration’s specific service, decoration and decoration construction process, standardized management, so as to achieve higher quality, better technology and create high-quality projects! Pretend to be your safe home! Abide by the contract and keep the reputation! Integrity based, you can see the truth! The quotation is open and transparent.
All inclusive – the main materials, auxiliary materials The advantages of contracting all labor and design to the home decoration company: time-saving, worry-saving and labor-saving, suitable for the crowd: the owners who have no time but are relatively economically well-off 2.
Construction of paint and finishing works (on-site acceptance by the owner) 5.
Bricklayer construction, on-site acceptance by the owner and submission of decoration phase II payment after completion 3.
The decoration time is long.
The designer and the engineering supervisor will follow up the service throughout the whole process, inspect the construction site to the completion acceptance of each process.
Customer satisfaction is the pursuit and yearning of chengyijia.
After the materials are signed and confirmed to enter the site, the construction starts.
Installation of integration and soft decoration products, cleaning and completion acceptance at the construction site, and customers, designers, engineering supervisors and managers participate in the project acceptance together, After passing the acceptance, the owner shall sign on the quality report for confirmation.
In the decoration budget table, many materials will be written with “actual settlement” Huaibei chengyijia project management and construction process The designer enters the construction site for on-site measurement – making the layout plan – making an appointment with the customer to see the plan.
3 decoration budget chengyijia decoration budget quotation table.
Each time we start, we will arrange a detailed construction schedule for each decoration site, so that the owners can better understand our progress and the time to complete the construction period.
Site protection, wall demolition, engineering construction, construction of concealed water and electricity works, and mobilization of main materials of ceramic tiles.
More thoughtful decoration owners 3.
After signing the contract, the designer preliminarily confirms the plane scheme and materials, reviews the budget with the Department Manager, determines the design scheme and budget quotation, signs the construction contract and pays the first installment.
Disadvantages: it requires a basic understanding of the assembly and repair process and material selection knowledge Pay a certain amount of time to learn decoration knowledge and spend a lot of time shopping.
Items can be increased or decreased according to demand.
The company culture and target company make every effort to provide perfect services for customers with the business philosophy of quality, reputation and benefit.
2 decoration methods.
Customers are welcome to guide the store, measure the room design and budget quotation for free, and see the construction site and model room on site.
Huaibei chengyijia decoration will always stand with you, share and solve various problems in the decoration, and spend the ups and downs in the decoration together! Let’s learn the process of decoration first! The content is long, but you must gain after reading.
Unpacking – the owner buys all kinds of materials such as hard decoration and auxiliary materials, even cement, sand, nails and wires, and asks the construction team to help design and command workers’ construction.
If you really belong to lazy cancer patients, focus on bold and discolored fonts.
It is suitable for people with certain decoration experience and rich time 2.
In addition, the budget table shall include budget description, process description, material description and acceptance standards.
The designer will come to the site to measure the room free of charge, communicate the design requirements with the customer on site, and issue a detailed budget.
The auxiliary materials should also be clearly marked as far as possible, and the itemized details in the table include the main materials, auxiliary materials and labor costs.
As for the decoration methods, whether you are an old house or a new house, you must find a construction unit to construct the decoration for you before you are ready to start, but most of them, such as starry contractors, road guerrillas and decoration companies, are making quotations for you, What method have you considered for construction? In short, the construction methods are mainly divided into the following types: 1.
For the main materials that the owner asks us to purchase on his behalf, the brand, specification, grade and model of the main materials will be itemized, so that the owner can compare the advantages and disadvantages of the materials and the price.
Advantages: saving money Disadvantages: it is laborious and laborious.
We have a professional design team, exquisite construction team, perfect after-sales service, appointment of special car transfer, one-stop service for decoration, design and construction, so as to make our home more perfect! 1.
Woodworking mobilization – the designer provides drawings and goes to the site to interpret and confirm with the workers and the owner – the woodworking is accepted and signed by the owner – the metope enters the site for one and two times of putty construction – during which the doors and windows are installed, the ceiling and cabinet are integrated, and the owner is notified of acceptance – after the doors and windows are installed, the metope carries out the third putty construction, and the construction is completed and protected.
Project warranty according to the contract and national regulations, the company is responsible for the project quality maintenance and after-sales service within a certain period of time.
Half package – contract the auxiliary materials (cement, sand, gypsum board, etc.), shingle oil labor and design to the home decoration company, and purchase the hard decoration main materials (floor tiles, cabinet ceiling).
Painters carry out painting construction – painters finish – cleaning and mobilization – owner acceptance – wood floor paving – owner acceptance and confirmation – construction is basically completed.