Back edge assembly and reinforcement requirements 11.
Plate keel support setting and plate large formwork assembly and reinforcement requirements 10.
Wallboard assembly requirements screw hole plugging and nut tightening inspection 7.2 wallboard assembly pin plate setting 8.
Support removal requirements the removal of support rod shall meet the concrete strength requirements for bottom formwork removal in code for acceptance of construction quality of concrete engineering gb50204-2015.
When removing each support, grasp the support rod with one hand and hammer the adjustable fulcrum in the loosening direction with a hammer with the other hand to remove the support rod.
Wallboard, top plate, special-shaped parts, K-plate and other large parts 2.
Generally, the bottom support of plate shall be removed ten days later, Remove the beam bottom support after 14 days and the cantilever bottom support after 28 days.
Roof plate removal requirements 16.
Cleaning and requirements before formwork erection of wallboard 5.
Setting of positioning reinforcement 2.
Introduction to aluminum formwork materials 1.
Cleaning, stacking and inspection of sleeve rubber cup 7 Wallboard assembly requirements 7.1.
Wall plate removal requirements 15.
Calibration review and reinforcement of wallboard and top plate 12.
Requirements for painting demoulding oil before formwork erection of wallboard 6.
Lower angle iron, angle aluminum, keel and support 3.
Inspection of lower angle iron 4.
K plate foot locking screw setting and plate lowering square steel setting requirements 13 Concrete pouring requirements 14.
Construction process of operating tools 1.
The removal time of support rod shall be determined according to the concrete formwork removal test block.
Reinforcement 4.
Douding construction welcome attention..
Beam bottom support rod setting and beam formwork assembly 9.
Source: Nantong Xinhua Construction Group Co., Ltd.
Material finishing 3.