If there is a construction period requirement during the construction, check it first.
When these leaders who like to change invented a new roof practice, it will look good to recalculate the unit price.
During the construction, Party A has no right to add terms, saying that the top can not be closed for a few months and days, and how much penalty will be imposed for a day’s delay.
The pump shift is not cheap, so the pump model should be written.
Many of the projects in the template part are priced by list.
If there is any infringement, please contact to delete!) long press the QR code to follow us ▶▶▶。.
For pile foundation, in addition to making records of concealed works, it is also necessary to pay attention to the visa of underground obstacles.
If there are underground obstacles, it should be verified.
If the excavated soil is transported away and backfilled, it will not be counted as money if the cost is not signed.
In addition, if the water seepage is large, the construction scheme can also be prepared to apply for drainage and dewatering measures and slope support measures.
It is recommended to collect them! Groundwater is not considered in the bidding of earthwork.
The price of wet soil is higher than that of dry soil, and the price of sludge excavation is higher.
(source: integrated on the Internet, the picture and copyright belong to the original author.
At the same time, it also reminds us: 1.
The concealed records shall also be as detailed as possible, that is, at least: hole depth, pile length, reinforcement cage length, empty section length, pile diameter and rock entry depth.
Because most of the bids consider the on-site stacking of soil, and the remaining soil is transported out.
The earthwork transportation distance naturally depends on whether it is beneficial.
If you can’t get the well point, you should strive for pump dewatering.
In the foundation construction, brick formwork is used in response to Party A’s requirements to speed up the progress or considering the need for early backfilling due to slope instability.
This is a fair rush fee, but in fact, everyone didn’t want it.
If there is water seepage in the excavation, the height of groundwater level can be verified.
The drainage in the precipitation and drainage quota is only the drainage of surface water and a small amount of open water.
If the conditions are not enough, don’t fool around with a small sump and go through the gang carefully.
The roof is often changed by Party A.
During the foundation construction period, if the construction period is suspended due to rain or delayed due to Party A, the drainage and precipitation expenses can be signed according to the table shift.
Therefore, the visa added in the template is particularly important.
Jianzhong001 has learned about the three principles of audit.
If the foundation construction is suspended or delayed, it should be signed.
The cost of clearing underground obstacles is not cheap.
The following pictures and texts will introduce you to the nine visa projects on the construction site in detail.
The most common occurrence of masonry in masonry is to dismantle and dismantle the masonry.
If it is not specified, it is likely to be cut directly for you.
These can’t be verified afterwards.
If rock is encountered, the depth into rock should be signed in time.
Of course, if the construction is suspended for a long time, it must be recorded.
The calculation in this is quite complex.
According to the legal construction period or the bidding construction period, the speed required by Party A now leads to the increase of the number of sets of templates.
The template is solved one by one.
If it is enough for visa, it’s good to form a habit; 3.
It must be remembered that the visa should not be delayed until the commencement, and it should be done at least once a month, which is also the principle of long-term visa.
The only thing to pay attention to is that overtime also increases a series of efficiency reduction expenses such as machinery operation salary.
Cooperation fee didn’t expect that the cooperation fee can also be visa, right? The cooperation fee is only that you provide water supply, electricity, scaffold, vertical transportation and other cooperation for other subcontractors to complete their processes (note that the water and electricity fee is not included in the cooperation fee, depending on how agreed in the contract).
The construction unit shall be responsible for the three supplies and one leveling of the site.
It is recommended to refer to relevant publications for more understanding.
Finished product protection finished product protection is not innate.
If it is required to mention it in the contract, the additional requirements will be paid.
If Party A does not agree on the progress or the agreement is not detailed enough, it can delay the work as much as possible to strive for claims in its own favor; 2.
It’s not that you have finished product protection of marble when you shop marble, but that you have done finished product protection seriously.
If the negotiation fails, it will ask Party A for a visa and withhold its project funds.
Although you don’t have much money, it’s not cost-effective to be cut down.
If Party B also participates in the work, it can negotiate with Party A.
If sufficient backfill soil cannot be stacked on site due to narrow site or unstable slope, the outward earthwork volume and haul distance shall be signed.
If the damage is not serious, the loss rate and secondary use of the brick can be signed to remove ash scars and slag, etc.
You should give as much as you sign.
if you master the know-how, you can cut in at a low price during bidding.
Otherwise, due to a long time, the supervisor of Party A cannot assess, and it will be troublesome to supplement the signature in the later stage.
Even if you take a penny around the scene and spread a broken sack, you should prove it as soon as possible.
If a large amount of drainage or quicksand treatment, it can be signed.
Some of the measures in the list are not clearly listed, causing trouble in subsequent settlement.
It is no problem to dismantle the wall, but the visa must explain the damage degree of the brick (otherwise the audit will directly reduce the materials for you).
If it does not exceed the scope of the list, it is OK.
Everyone knows that the oil price is so expensive now.
If there is no requirement at the time of bidding, it can also be signed, and the price of brick formwork is higher than that of formwork erection.
Some things are unreasonable.
Pay attention to the well point.
Note that when calculating the unit price, do not forget the exhaust pipe and pipe fittings of the insulation layer, the oil impregnated wood wool board and ointment caulking of the surface protective layer.
There is also the template added for rush work.
Vertical transportation is similar to the formwork part.
If it exceeds the scope, the transportation distance must be signed.
However, if the subcontractor damages or pollutes your things, it will not ask him for it.
Although it can be argued, it is always good to do things ahead.