Journey of ingenuity │ enter the keel ceiling process of the construction site!

The wall is fixed with expansion screws, shooting nails or cement nails.

Apply emulsion paint to putty! Remove the dust on the surface of gypsum board before applying putty.

Check the flatness of the whole surface, and the pull-through line level shall not exceed 5mm, and the 2m scale measurement shall not exceed 2mm , the height of the plate seam interface shall not exceed 0.5mm.

04.

The ceiling not only affects the visual effect of the whole home, but also undertakes the functions of thermal insulation, heat insulation and sound absorption.

The surface of gypsum board shall be flat and clean, with consistent color, and the ceiling shall be free of cracking, damage and warpage; 3.

05.

Install keel! Drill holes, install expansion screws and screw rods, then install the main keel, and finally adjust the main keel.

  There shall be two layers of sealing plates on the inner and outer sides of the ceiling lamp slot, and the side elevation of the wooden ceiling shall be supported by wooden keel to prevent deformation and hanging outside.

Many people even regard the ceiling as the top priority of hard decoration design, enriching the expression of the whole interior, so as to highlight the difference of their home.

After sealing the second layer of plate, it must be checked whether each layout is firmly pasted, whether there is hollowing, bulging, and whether the gun nails are exposed.

The joints shall be smoothed with caulking gypsum; after the gypsum is dry, it shall be pasted with kraft paper tape for crack prevention treatment/ “Code for acceptance of ceiling”   Wechat order   1.

I believe everyone pays great attention to the woodworking decoration process and construction process.

The measuring point of the auxiliary keel shall be installed in a cross with the main keel.

The spacing of auxiliary keels shall not be greater than 40cm, which shall be installed evenly and equally in turn.

The manufacturing process of double-layer board ceiling , which is conducive to enhancing environmental protection, improving fire resistance and preventing cracking.

Install boom! Install boom, usually with Φ The 8mm screw rod is connected with the jacking screw, and nuts are equipped up and down for reinforcement to prevent loosening up and down.

Flat End Socket

02.

3-6mm expansion joints shall be reserved between the two gypsum boards and between the gypsum board and the wall to prevent later thermal expansion and cold contraction.

The edge of the auxiliary keel shall be connected and fixed with the side keel, so the edge shall be specially cut and fixed with a nail gun.

Use a tape measure on the left and right sides of the wall top to determine two points respectively based on the width data of the ceiling, snap a line with an ink bucket, and determine the width of the ceiling on the wall top based on the horizontal line.

Gypsum board installation! High quality gypsum board, high flatness, less hollowing in gypsum, compact and high strength, good water resistance and fire resistance.

The ceiling is constructed with light steel keel, and the side keel reinforcement construction process is adopted to facilitate the sealing of the rough edges and inspection parts of the ceiling, so as to keep the edges and corners neat and straight.

The joints of suspender and keel shall be uniform, and the surface shall be flat without warpage and hammer mark; 4.

The suspender shall not be bent, and the spacing of suspenders shall be within 60cm.

Let the standard become a habit, let the habit meet the standard, and make the standardization routine, so as to truly “abide by the quality project, do intimate service and earn good returns” —     🚏      ❥❥❥❥❥     📮    — RECOMM.

Snap the horizontal line and set out! Set out a horizontal line on the top of the wall according to the drawing.

The measuring point of the auxiliary keel shall be installed in a cross with the main keel.

The ceiling with reasonable planning can make the space partition clearer, the level richer and the style more prominent Two / “light steel keel gypsum board ceiling – construction process” 01.

When the gypsum board is capped, the “L” shape is used to treat the corner, which can avoid the easy cracking of the ceiling corner in the later stage.

On the ceiling, the joint between gypsum board and gypsum board shall be treated with “V” joint, which is more convenient for powder filling in the later stage.

The installation of keel, suspender and gypsum board shall meet the design and specification requirements, be firmly installed and intact as a whole; 2.

The non-standard ceiling construction will seriously affect the beauty and threaten the personal safety of the owner.

How to grasp the details in the construction and achieve “unlimited scenery” on the “top”? Let’s take you to know about Haotian ceiling technology, so that you can be more assured of concealed decoration ONE  / “Why should home decoration be the ceiling?” the shape of the ceiling highlights the style and style of the home.

For walls such as load-bearing walls or lintels, holes shall be drilled and wooden wedges shall be placed on the wall first.

The nail holes of ceiling shall be painted with antirust paint and adhesive powder, and smoothed with caulking gypsum.

Haotian technology phase V    Ceiling Technology  – phaseI-imagecraftandconstructionsafety  – In the home space decoration, the woodworking decoration process is widely used.

– acceptance time – “intimate home decoration, quality makes warmth” is not a slogan, but a code of conduct.

03.

The main keel is fixed on the ceiling and wall with expansion screws, the wooden keel against the wall is fixed with expansion bolts, and the secondary keel is grafted with thickened strong steel keel.