according to the requirements of the drawings, and shall be responsible for the connection of main pipes, the connection of water tanks and the laying of pipes to the high-speed filter room and the fabrication and installation of supports, If the drawing shows that it is not connected to the main pipeline, pool or cooling tower, the construction party shall connect the whole set of equipment.
After the financial account of Party A is recorded, the payment shall be made on a monthly plan to pay Party B to settle the construction expenses.
Party A shall issue a completion certificate, and Party B shall issue a special invoice for value-added tax.
The opening waterproof of the pool shall be completed by the construction party.
Settlement method: acceptance settlement.
The construction contents include the installation of water pumps, motors, pipes, valves, rubber joints, pressure gauges, flow meters, etc.
Contact: Wang Zhongshan Tel.: 18134164567 。.
Deadline for quotation: before 3:00 p.m.
Please submit the company qualification to party a first.
Party A shall be responsible for thermal insulation, dosing room and chemical degreaser.
3、 Payment method: after the construction is completed and accepted by Party A, 60% of the completion payment shall be paid to the construction unit.
The above construction shall be carried out according to the overall drawings, and all steel shall be derusted and painted according to the requirements of the drawings.
4、 Quotation and construction period (including tax price) Expense amount: element Duration day Tax point 。 Quotation unit (signature and seal): negative responsibility Person: newspaper price day Period: Couplet system square Formula: Special note: the quotation of those who fail to pass the supplier qualification audit of Party A is invalid.
2、 Responsibilities and obligations of both parties: Party A shall provide water, electricity, steel, equipment (including water pump, motor, flowmeter, valve and other supporting equipment) and paint free of charge; Party B: Party B shall be responsible for completing the construction according to the contents of Party A’s drawings, be responsible for its own construction safety during the construction process, ensure the construction quality, and provide its own cranes, trucks, auxiliary materials and tools and instruments (including oxygen, acetylene, welding rods and safety protection facilities) required for the construction.
The quotation sheet and specific scheme for water supply and drainage construction of steelmaking horizontal flow tank are as follows: construction content, scope and requirements: installation and construction of water supply and drainage pipeline, support and equipment of horizontal flow tank, drawing No.: 264m424p602.
on November 5, 2021, please seal the quotation and send it to the audit and supervision department of Wenfeng group or send the scanned copy to the email: WFJTSJJCB@163.com If the contract is not signed due to Party B after bid opening, Party A shall directly deduct 5000 yuan from Party B’s account as liquidated damages.
Warranty period: 12 months after normal use, warranty deposit: 10%.