If contracted, it is calculated according to the total length of bridge construction, 20-28 / m.
We are entrusted to find the bridge construction personnel.
If you are interested, please contact directly.
Please contact the interested friends directly.
It is required to have a work at height certificate, a 100mm * 100mm bridge of about 700m, a construction height of 7m, and a climbing car and scaffold.
Due to the development of the company, the company has several bridge projects.
Learning recommendation: VIP technical exchange group: click my weak current scheme and quotation: click my weak current drawings: click me..
Treatment: it can be contracted or calculated according to the point work, which is 350-450 / day.
Qian needs relevant work experience.
Location: Rugao, Nantong, Jiangsu Tel: 18913107380 Mr.
It needs 2-4 people, at least 2 people.
Position 1: bridge construction personnel job responsibilities: there are weak current engineering projects, and bridge construction personnel need to be found.
At the end of December, there was Qian Zong in the weak current VIP technology group.