Scold! Interconnection of Party A, supervision, construction, survey, design, quality inspection and drawing review! Who do you support?

Does the drawing review company require to change this place? Are they mentally handicapped? They have to pay more for such a change.

Now the budget is well reported to the company.

You can teach me how to do more than 20 longitudinal bars added to the columns and beams in the core area.

The real tm2b of drawing review clearly means this.

5.

What else are you looking at? What time is it? Labor and capital are in a hurry to get off work, you know? 6.

It’s none of my business.

3.

What does it mean that the stratum is completely inconsistent with the excavated data? The steps of basic body completion have something to do with you.

Drawing review is killing the construction? gayapainfast! Construction perspective 1 Party A, do you still dare to order Bilian? For the high-rise buildings on the 20th floor, will you give me 1200 yuan per square meter? Niang xipi, where did you get the material? Sell me bean curd residue as golden beans? Why can’t you keep up with the progress? You TM recruit people for me.

3.

Don’t cling to the specifications, or the construction period will be delayed for another day.

Cancel pulling down! 5 quality inspection has a bird to use.

You TM haven’t seen money in your last life, have you? What do you think is wrong with this place? Here, take it.

2.

If Party A urges you to carry it? I do this on so many construction sites.

Hurry up.

Seeing a friend say that the construction design mutual recognition of each other is not a good thing, in fact, Party A, supervision, construction, survey, design, quality inspection, drawing review and other relevant units of construction projects think that the people of the other parties are not good people, without exception.

Two Hole Anchor

How is the bearing capacity of the pile calculated in the survey? Why can’t it be reached? Shit, you’re blind when you survey such a big backfill pit? I have to pay for it myself.

The design checking calculation says that the bearing capacity of precast piles calculated by them is higher than ours? Don’t these staff making children know how to round conservatively? Of course, the calculated 2680kn is based on 2500kN, otherwise you will count me if something happens? MD, can you stop inventing and creating? I said to use silt as the pile end bearing layer, that is, use silt as the pile end bearing layer.

What are you doing? 4.

What do you think? Who are you! Design perspective 1 beeps.

You should bear the loss.

3.

Party A is going to kill the labor and capital, so the labor and capital have to ask you why the construction progress can’t keep up? Why didn’t our people stand by for the inspection materials? Why didn’t the working face be cleaned before the construction of concrete? Want to save trouble, you’re so straight, when I’m three years old, dare you fool me? I want you to tell me several times that the reinforcement should be full, full and can’t jump! How can you go bankrupt with one more hoop? Do you want to reduce the lap length by 10 cm? Pouring is not allowed if the reinforcement inspection is not passed.

Do you understand the rules of quality inspection? Just check the rectification list issued by labor and capital.

Construction must want to cut corners; Can’t you understand the drawings? This place should do this blablabla; Why don’t you listen to the supervisor and why can’t you keep up with the progress? This construction scheme is made of gauze.

What do you think in your mind about the construction? Paint the waterproof inside the basement wall? The design is really sb.

If you give me, the labor and capital can also make that level of drawings..

4 design you TM tell me how to arrange so many steel bars in this place? Even if it can be arranged, the concrete stones can’t pass.

Party A’s perspective 1 the supervisor must collude with the construction and will pit me for money; What are you doing in the office? Go to the site, watch the construction, and deal with the wool documents.

2.

Shut up! 6 why am I running in the drawing review? Why do I have to take it to an expert for review? Do so many people in your drawing review company TM eat shit in the office? It takes three or four days to review a map, really TM.

I can write it better than you.

Is it great to wear a supervisor’s white hat? As I said, no problem.

Have you seen how to do construction? Do you even have different concrete grades of beams and slabs? Electrical, are you blind? Tell me to put the power distribution cabinet on the community road? Tell you to make a change order as I say.

Survey perspective 1 Party A’s eldest brother, you have the ability.

What happened? MD will kill you again.

This is the last time I went to Beijing for a lecture.

The footage of a single hole is actually 55m? You must write more for money.

The survey data are all compiled by TM.

I’m in a hurry? What? You still need an internal audit? If labor and capital say no problem, there will be no problem! 5md quality inspectors are going to give red envelopes again.

When labor and capital ask you for money, you have to hurry up.

Who told you to inform the mixing plant to send concrete? Shit, how dare you fight me? Wait, brother, let’s have something to say.

Labor and capital do not work the same whether they come or not; Shit, you have to plug money again; MD, I can’t see such an obvious problem.

How can I pour it? You TM are really a talent.

Eat shit! 6.

four   Shit, if you move the mouse and keyboard in front of the computer, you dare to ask me for 12 yuan a square meter of design fee? Are you the monkey who invited you to do the general layout? If labor and capital ask you to do it according to this plot ratio, you can do it.

How can labor and capital catch up with the progress without money? MD is two days late today and has to be criticized again.

The survey is really shameless.

Where did party a invite you? Doubi, who told you to sprinkle water and tamp after excavating the trench? MD disturbed the soil and came to check a bird’s trough? You’re not crazy, you’re in the shit, aren’t you? Don’t you cut the CFG pile? What do you want me to see? Can you show me how to go down this base slot? 4.

2.

Dare you say you understand? You know, tell me what kind of soil you’re stepping on now? What is it suitable for? Do you know why I choose end bearing pile instead of friction pile for this project? Do you know that the composite foundation of this project is not suitable? You know dog P! 3.

2.

TM if you go deeper, you have to check and calculate the weak underlying layer, okay? Where is so much trouble? What is quality inspection? Can you eat it? 6.

The reason why we can’t catch up with the progress is that we work slowly.

Can you tell me the level of Shanghai? Do you dare to give me the design treatment level in Shanghai? 50 yuan per square meter, three months.

How to change it? Change an egg! From the perspective of the supervisor, Party A of the project wears a pair of pants with the construction, which is a p? Hurry, hurry, hurry an egg.

Who knows how to check the concrete vibration quality after this? Come on, electrical, tell me which genius found this equipotential method, and there’s nothing in the atlas.

If your supervisor wants to understand the design, I believe you TM know how professional geotechnical engineering is.

Professor XXX told me that they wrote this sentence.

Labor and capital are older than you in construction.

It’s like a dog.

Labor and capital go to the Planning Bureau for you during the lighting time; Is architecture made of sticks? Can’t you understand such simple requirements as simple, generous, high-end and foreign style? For the structure, first reduce the steel content to 30kg / ㎡ and then put p; For water supply and drainage, why do you use such high pressure to dry eggs? Why does it make sense to set a separate condensate drainage for the air conditioner; Why should electrical do so many socket switches, pull down one in a room, and pull the cable for no money? HVAC has an egg.

Can you check the settlement of the 28 storey building with 40m footage? Do you have the ability to ask the Ministry of housing and urban rural development to change the specification to say that the spacing of survey holes can be greater than 50m? If you can, I’ll kneel down and call you Baba now.

It’s just a 28 storey building with a basement.