The construction site “nine cards and one drawing” has the most complete content!

Earnestly implement the relevant regulations of the city on environmental health protection.

Fire prevention measures shall be taken when boiling asphalt on site, and a special person shall be appointed to take charge of it.

9.

Personnel who do not understand electricity and machinery are strictly prohibited from using and playing with electromechanical equipment.

9.

3.

It is not allowed to operate with diseases, overload operation or repair and maintenance during operation.

Non operators are not allowed to enter the hoisting area, the hoisting machinery must be intact, and no one is allowed to stand vertically below the handle.

7.

2.

5、 Safety production technology brand 1.

3.

8.

Use “three treasures” as required.

All kinds of electric mechanical equipment must have reliable and effective safety grounding and lightning protection devices before they can be started for use.

It is strictly prohibited to steal rock and soil for earthwork and excavate deep foundation pit without slope or support as required.

The living area must have complete and effective facilities.

It is strictly prohibited to walk on the high place operation without railings or other safety measures and the single wall brick line.

5.

4.

5.

7.

Electric welding near inflammables and explosives is not allowed.

Smokers should prepare ashtrays, and cigarette butts and matches must be thrown into ashtrays.

2.

Various cables and devices must meet the requirements of the regulations.

If there are no safety facilities for high-altitude suspended operation above 2m, the safety belt must be fastened and the safety hook must be fastened.

6.

9.

It is not allowed to use more than 60W bulbs for lighting in the dormitory.

4.

8.

Scaffold materials and erection must meet the specification requirements.

9、 Environmental protection board (building construction site protection board) 1.

It is not allowed to connect the power supply randomly in the dormitory and office, the part-time electrician is not allowed to connect the fuse privately, and it is not allowed to replace the fuse with other metal wires.

It is not allowed to burn sundries and waste paper in the dormitory and on the construction site.

It is strictly prohibited for operators to start any machinery, connect and remove wires and electrical appliances without permission.

Electric welding and gas welding personnel shall strictly implement the operating procedures and carry out the fire certificate system.

It is forbidden to bring children into the construction site for operation.

The noise emission at the site boundary of the construction unit shall be implemented according to the following standards: Earthwork stage: day ≤ 75db (a):   Night ≤ 55dB (a):   Piling stage: daytime ≤ 85dB (a):   No construction at night structural stage: day ≤ 70dB (a):   Night ≤ 55dB (a):   Decoration stage: daytime ≤ 65dB (a):   Night ≤ 55dB (a): 3.

10.

It is strictly prohibited to carry out risky operation in the dangerous area of high-voltage power supply, operate the motor-driven terrazzo without insulating shoes, and directly move the lamp cap wires by hand for lighting.

4.

The dormitory area is clean, the food is clean, and there are fly prevention devices.

Canteen personnel shall take up their posts with health certificates, wear uniform work clothes and hats during work, and do a good job in the internal hygiene of the canteen.

It is not allowed to wear hard soles and shoes with nails and easy to slide for high-altitude operation.

2.

5.

It is not allowed to set off firecrackers and fireworks in the dormitory area, construction site and restricted area specified by the Public Security Bureau.

The construction waste such as floor ash and bricks on the construction site shall be cleaned every day, and the waste shall be stacked neatly with the name and variety marked.

It is strictly prohibited to play, make noise and throw materials, tools, masonry sand mud and all sundries from height at the operation site.

  10.

safety production discipline board   1.

The Interim Provisions on environmental protection of construction sites in high tech Zone must be strictly observed.

3.

The doors and windows in the dormitory shall be clean, the ground shall be free of garbage, and the toilet shall be cleaned by a specially assigned person to keep the ground clean without ponding.

The erection of wires and lines must comply with the regulations of the local power bureau, and all electrical equipment shall be grounded.

It is strictly prohibited to smoke or make fire at the site and warehouse where there are dangerous goods, inflammables and carpentry yards.

There must be protective measures at the stair entrance, elevator entrance, reserved opening and passage entrance of the project under construction.

The construction area shall be separated from the office and living areas, and the project under construction cannot be used as accommodation.

8.

Inflammables and explosives are not allowed to be brought into the dormitory.

4.

Places of study and entertainment should be set up to provide hygienic and healthy drinking water.

7.

During high-altitude operation, it is not allowed to throw materials, tools and other objects up or down.

It is strictly prohibited to wear slippers, wooden shoes, high heels and helmets to enter the construction site for operation.

6.

Effectively protect construction personnel to prevent various occupational diseases.

9.

When entering the site, you must wear a helmet, buckle the hat belt, and correctly use personal labor protection articles.

Take good care of public property, do not arbitrarily damage all public facilities in the site, and pay attention to the protection of finished and semi-finished products.

2.

6.

2.

If the operation must be continued due to production process requirements or special needs, it must be reported to the Construction Management Bureau and the Environmental Protection Bureau for approval.

5.

Electric machinery and hand-held electric tools on site are equipped with leakage and tripping devices.

It is forbidden to burn construction waste, linoleum, paint, plastic and other articles that produce harmful and toxic gases and smoke.

5.

8、 Health notice board   1.

4.

Overweight equipment such as tower crane must be equipped with limited position devices.

3.

5.

7、 Fire protection (fire prevention responsibility) board   1.

2.

7.

There is no ponding on the construction site, and sewage and waste water are not allowed to be discharged randomly.

5.

Flat End Socket

From safety production technology i.

Materials, components, machines and tools shall be stacked in an orderly manner according to the general layout, and labels such as name, variety and specification shall be hung on the material pile.

6.

3.

Fire burners in canteens, bathrooms and stoves shall not leave their posts without authorization, clean up the residual ash of stoves in time, and shall not run around.

10、 Construction site layout plan..

It is strictly prohibited for all personnel to work, stand and walk on and off the lifting frame, the hanging basket of the crane, and under the lifting frame, wellhead or lifting objects.

8.

The roads around the construction site are smooth, the ground should be hardened, the drainage and sewage facilities are effective, there is no ponding, and there are greening arrangements in warm seasons.

6.

2.

It is not allowed to throw cigarette butts and matchsticks in dormitories and offices, or smoke in bed.

There are civilized and hygienic conventions and first-aid measures.

4.

Do not eat unclean food to prevent food poisoning.

It is strictly prohibited to wear high heels, slippers and barefoot to enter the construction site.

It is not allowed to open small stoves in dormitories, warehouses and offices; It is not allowed to use rice cookers, electric kettles, electric stoves, electric cups, etc.

Do a good job in heatstroke prevention and cooling during construction in high temperature season, and do a good job in cold prevention and warmth preservation during construction in cold season.

The slurry water generated during construction shall be properly treated.

safety billboard   2、 Construction personnel profile board   Project Manager:        Deputy project manager: Technical Director:       Safety principal: material principal:       Accounting principal: Data principal:       Test Leader: Post security:        Quality Director: III.

6.

Without sedimentation treatment, it shall not be directly discharged into the municipal sewage pipe network, and the domestic sewage shall be discharged into the nearby sewage pipe network.

if necessary, the administrative office shall designate a unified place, but it is strictly prohibited to use electric stoves.

Fences shall be set around the construction site according to regulations, enterprise signs shall be set at the gate, and “nine boards and one drawing” shall be hung to implement closed management.

10.

It is forbidden to carry out construction operations that produce environmental noise pollution at night (22:00-6:00 the next day).

Establish a guard system, and must wear certificates when entering the construction site.

It is strictly prohibited to carry out cross operation up and down at the same time in the same part without safety measures.

4、 Construction personnel profile board   1.

6、 Ten safety measures board 1.

The height of the bulbs from the ground shall not be less than 2.5m, and the distance from mosquito nets and other items shall not be less than 50cm.

The protective devices of mechanical equipment shall be complete and effective.

3.

7.

4.

Cooks must undergo physical examination and work with certificates.

It is not allowed to bring kindling into warehouses, construction dangerous areas, carpentry rooms and wood products stacking sites.