The north section of Qinglinghe Road, the west side of the big market, began to encircle the construction

The section to the south of Lishui road has resumed two-way traffic, and the encirclement construction should also be carried out in the later stage.

At the beginning of this month, Qinglinghu West Road (Qingling Hubei Road – HUTANG Road) the bidding / prequalification announcement was issued for the upgrading project.

In March, affected by the construction of Lishui Road, Qinglinghe road was changed to one-way traffic.

There is no doubt that the road will be built, which also means that the Qinglinghe road widening project has officially started.

The machine inside the encirclement has entered the site and is digging the road.

The reconstruction scope of qinglinghu West Road is from Qingling Hubei Road (chainage K0 + 000) to HUTANG road (stake No.: K1 + 783.613), with a total length of 1783.613m, and the intersections with Qingling Hubei Road, Lishui West Road, yuanjiahe road and HUTANG road are all within the scope of this reconstruction.

In addition, The project includes the reconstruction of qinglinghu West Road (Qingling Hubei road ~ HUTANG Road) and Qinglinghe East Road (HUTANG road ~ qinglingsi Road).

Recently, Lishui road was completed and opened to two-way traffic.

The red line of Qingling Hu West Road (Qingling Hubei road ~ Lishui West Road) is 40m wide, and the red line of Qingling Hu West Road (Lishui West Road ~ HUTANG Road) is 30m wide.

gk0 + 040) to qinglingsi Road (stake No.

Many small partners wondered what they would do after demolition.

The reconstruction scope of Qingling he east road is HUTANG road (stake No.

The implementation subject is the 1.5km illegal construction demolished earlier.

This section of the road is 1783.8m long and 30-40m wide.

It is an urban secondary trunk road.

Fixing Socket Cross Hole Nail Plate

However, Qinglinghe road did not immediately fully open two-way traffic.

In fact, the implementation pavement of this project is Qingling River Road.

In mid September, nearly 1.5km of illegal buildings in the west of the big market and cold chain market began to be demolished.

The investment of this bidding project is 157.9936 million yuan, that is, nearly 160 million yuan, and the planned construction period is 524 days…

The crossing of qinglingsi Road (64.83m long) is not within the reconstruction scope, the carriageway (motor and non common slab) is 18m wide, and the sidewalk on one side is 3.5 ~ 4.5m wide.

gko + 393.83), with a total length of 289m.

Recently, the eastern half of Qinglinghe Road north of Lishui road was completely encircled.

At first glance, you may think that this has anything to do with Qingling River Road.

At present, the intersection of Qinglinghe East Road and Qinglinghe road is also under siege, and the two sections of roads may be constructed together as shown in the site drawing.

However, the encirclement part is limited to the section to the north of Lishui road.