Two major preparations should be made before decoration construction

Cabinets; 6.

2.

Furniture and ceiling (including buying and making); 3.

By visiting the market, you can have an intuitive understanding of the type, price and performance of loading.

The construction party is responsible for the procurement and construction of all materials.

Many customers are not enough, and they naturally have to pay more if they ask for more; Some low-cost packages do not include water and electricity transformation.

Size decorations.

Don’t argue.

However, air conditioners and sockets should be considered as well as possible, and those that should be buried and replaced must not be saved.

Often, the owner starts to see the unit price in the hydropower transformation, thinks it will not cost a lot of money, and blindly requests to lay all kinds of lines to each room.

Cabinet and bathroom wall and ground waterproof; 4.

Hydropower transformation; 2.

Curtains and accessories; 13.

Suitable for the needs of most people.

The long-term facilities should be beautiful and practical, such as toilet, cabinet, etc.

Hydropower transformation requires high safety.

1、 What kind of decoration method to choose: 1.

Insufficient bag cleaning: more time and energy are required to clean the bag.

Anti theft door; 15.

About 500-700 yuan per square meter can fully decorate a good quality home.

Choosing your own materials can fully reflect your will.

It takes a lot of time to visit the market, understand the market and select materials; We also have to contact vehicles to transport materials; The construction period will be relatively long.

Due to the large purchase volume, the prices obtained are all base prices.

If you have no special needs, multiply the square meter of your home room by 500-700 yuan, which is almost the decoration budget of your home.

Threshold stone (terrace stone); 10.

In fact, if this price can really bring convenience to your future life, the theory of being cheated is not tenable.

Decoration budget: it is very important to think about how much you want to spend and how much you can afford before decoration! The decoration budget of a house is roughly used for the following 17 parts: 1.

It is necessary to have a good understanding of the materials when clearing the package, otherwise it is inevitable that you will not be fooled in the process of dealing with the material supplier.

Some shouted that the decoration company had fooled him.

Floor and floor tile; 8.

Electrical appliances (water heater, air conditioner, smoking machine, gas stove, exhaust fan, etc.); 14.

As a result, 8000 results will exceed the budget.

For the house type with two bathrooms, the package decoration only includes one set of bathroom equipment, and the second bathroom only includes floor tiles, walls and top coatings.

Lifting Eye

If there is any problem, just find them directly.

Package tips: most package prices only contain basic processes, and you have to pay more for necessary processes such as wall demolition, hole drilling, partition wall and waterproof; The number of cabinets and paint free doors included in some packages is limited.

II.

Cleaning: also known as cleaning contractor, it refers to a project contracting method in which the owner purchases all materials and finds a decoration company or decoration team for construction.

The construction party is responsible for the procurement of construction and auxiliary materials, and the main materials are purchased by the owner.

Toilet ware (toilet, bathtub, washstand); 7.

Reduce the investment in things that are worn out and can be replaced at any time, such as curtains, sofas, etc.

As a result, many “uncontrollable” factors eventually led to some home decoration packages “opening low and going high”.

Hardware materials; 9.

How much money you have to do, if you don’t have enough funds, don’t start work blindly~~ Recommended reading ~ ~ how to determine the responsibility of each unit in case of “dangerous project” accident? Is it according to these 10 articles that the private life of the project manager on the construction site is chaotic? You are on site, do you know earthwork..

Paint and coating; 5.

When reviewing the decoration contract, ask the company to come up with the basic unit price of hydropower transformation.

Disadvantages of all inclusive: high cost.

3.

Due to the complexity of material prices and types, decoration households know very little.

Package: package decoration is to combine the materials, namely wall tiles, floor tiles, floors, cabinets, sanitary ware, doors and door jambs, window jambs, wall paint, ceiling, etc.

Half package: a method between clear package and half package.

According to decoration experts, about the cost of family decoration.

Advantages of half package: the main materials with high value can be purchased by themselves, which can control the bulk of the cost.

Package calculation: the calculation method of package decoration is to multiply your residential building area by the package price, and the data obtained is the full amount of decoration; Including wall tiles, floor tiles, aluminum gusset plates, doors and covers, window covers, cabinets, sanitary ware, labor and auxiliary materials.

Lamps; 12.

The package is a very complicated and controversial thing.

Although each package can be upgraded, the upgraded part has to be paid by the customer; In addition, some package decoration has a minimum price for small houses with an area of less than 60 square meters, which is calculated as 90 square meters, while those with an area of 90 to 100 square meters are calculated as 100 square meters.

4.

When experts do package cost accounting, they directly calculate according to the base price and give benefits to consumers.

How much can the package save: “package decoration” is about 30% lower than the average purchase price of main materials and zero purchase.

Advantages of bag cleaning: large degree of freedom and control.

All brand main materials in the package are purchased directly from major manufacturers, general distributors or offices.

Installation cost of lamps, sanitary ware, etc; 17.

Once the decoration company falsely reports the price or cooperates with the material supplier to deceive the owner, it is difficult to identify.

It is easier to purchase by the construction party.

Half package disadvantages: refer to the disadvantages of package cleaning.

Cabinet and bathroom ceiling; 16.

Once there is a quality problem in the decoration, the responsibility of the decoration company cannot be shirked, because they are responsible for the labor and materials.

If you are an old house decoration, add 30% – 40% to this amount.

with brand main materials and basic decoration.

All inclusive advantages: it is relatively time-saving, labor-saving and worry-saving, and the responsibilities and rights are relatively clear.

The types are complicated, and the owners of auxiliary materials with low value are not easy to understand.

Cupboard, bathroom and balcony tiles; 11.

Measure the approximate length of the line reconstruction yourself to see if your economy can bear it.

You don’t have to have a network and sound cable in every room.

Let’s comment in detail.

All inclusive: also known as contracting labor and materials.