What is the difference between the civil engineer of Party A and the constructor of Party B?

Be responsible for the contact and coordination with the project construction and supervision units, earnestly implement relevant contract terms, and supervise the work of the project department and supervision department of the construction unit.

Participate in the bidding and bid opening of materials and equipment related to the project and the bid opening of subcontracted projects.

Responsible for on-site Q & A on civil engineering of the bidder..

5.

2.

Assist the project manager to make preparations for the commencement of the project.

The things in the organization design depend on the constructors’ on-site supervision, measurement, preparation of construction logs, reporting the construction progress, quality and handling on-site problems.

Therefore, the goal of many constructors of Party B is to be a civil engineer of party a one day in the future.

Many people say, what is the difference between a constructor and a civil engineer of Party A? About the same? Aren’t they all operated on site? That sounds like a layman! Then, where is the difference between the constructor and the civil engineer of Party A? Let’s take a look at the civil construction process.

The main work content is to go deep into the construction site under the leadership of the project manager, assist in the construction supervision, review the quantities together with the construction team, provide the specifications, models and arrival dates of materials required at the construction site, do a good job in the acceptance, certification and management of on-site materials, timely accept the concealed works and certify the quantities, and assist the project manager in the collection of project data Keep and archive, and take important responsibility for the progress and cost of on-site construction.

Review the material plan and consumption of the construction unit and sign opinions.

2.

3.

3.

Lifting Socket

The site representative shall reward and punish the site according to the implementation of the project.

Source: the copyright of China Civil Engineering Network belongs to the original author.

The designer shall actively cooperate with the construction, be responsible for explaining the design intent, interpreting the design documents, timely solving the problems in the design documents during construction, be responsible for design changes and modifying the budget, and participate in the project completion acceptance.

What about the civil construction personnel of Party A? Party A’s civil engineer is a professional engineer appointed by Party A, who is fully responsible for the supervision of the construction organization, project quality, progress and investment of the designated project, and keep the site log.

4.

Be responsible for the submission of data required for the design of the project and the coordination of relevant matters in the design process.

2、 The unique status of the constructor determines that there is a close relationship between him and relevant departments, which is mainly reflected in the following aspects: ① there is a relationship between the constructor and the project construction supervision unit and the construction unit, so the constructor should actively cooperate with the on-site supervisors in construction quality control, construction progress control All kinds of work and inspection in the three aspects of project investment control, and fully perform the project contract.

6.

② The constructor controls the construction, production and progress of the project, and is the information distribution center of the unit’s construction site.

5.

③ The constructor is the hub of external contact at the construction site of the project.

At the same time, if the constructors find unexpected new situations during the construction process, resulting in changes in the quantity, quality and form of the project or any part thereof, they shall timely reflect them upward, which shall be solved through negotiation between the construction unit, the design unit and the construction unit, and handle design change and negotiation.

In serious cases, it can be stopped for treatment.

It is necessary to command and coordinate the relationship between budget personnel, quality inspectors, safety personnel, material personnel and other grass-roots professional managers.

④ Constructors are the link to coordinate the relationship between grass-roots professional managers and labor personnel on the construction site.

First of all, from the perspective of constructors: constructors are the technical organization and management personnel at the grass-roots level.

Responsibilities of civil engineering management post: 1.

4.

Participate in the bidding of civil engineering, and be responsible for cooperating with the budget department to prepare the base bid price and invitation for bid.

The personnel mainly involved in the construction site include Party A, the construction party and the supervisor.

10.

8.

Be responsible for the contact, review and confirmation of engineering design changes, carefully review drawings and find problems in time during construction.

Be responsible for reviewing the monthly site report and signing opinions on the allocation of monthly project progress payment.

In our industry, we often think that the construction party is the most difficult, and Party A’s nature is the most comfortable.

② There is a working relationship between the constructor and the designer.

7.

Constructors are the specific practitioners of various organization and management work of construction enterprises at the grass-roots level.

Be responsible for the coordination between the project construction site and all departments of Party A, participate in various meetings on the site, timely arrange the on-site work, and implement Party A’s requirements on the site.

Assist the manager of the engineering department and the project manager in the preliminary operation of the project.

Participate in the review and bid evaluation of civil engineering bidding data and documents, and put forward reasonable suggestions.

In your opinion, the supervisor is at best to muddle along.

Participate in completion acceptance and commissioning.

The work of constructors is to specifically solve the relationship between the construction organization design and the site at the construction site.

They are the liaison between the project headquarters and the construction team.

Report the construction site situation to the leader in time, participate in the office meeting, and put forward suggestions on the project progress.

1、 The construction worker is the organizer and manager of the production line at the construction site, and plays an extremely important role in the construction process, which is embodied in the following aspects: ① the construction worker is the management center of the construction site of the unit project, the embodiment of the dynamic management of the construction site, and the organizer of the reasonable input and optimal combination of the production factors of the unit project, Be directly responsible for the construction of unit projects.

Be responsible for the site petty worker visa.

They are the most grass-roots technical and organization management personnel to complete the construction and installation tasks.

The specific responsibilities are as follows: 1.

At the same time, after reviewing the actual consumption of materials every month, the construction site shall report to the cost department; Materials arrive at the site to assist Party A’s quality inspection personnel, eliminate the use of “three noes” products in the project, and avoid waste and capital occupation.

9.