At present, Xiaoxian Fengcheng hospital has entered the preliminary preparation stage of construction, and the temporary plank house is being installed.
Xiaoxian Fengcheng hospital is located in the south of Xiaoxian Baijiang Huafu No.
1 hospital and the central area of Xiaoxian Fengcheng.
Xiaoxian Fengcheng hospital project covers an area of 110430.60 square meters, with a total construction area of 165573.60 square meters, including 20946.30 square meters of outpatient building, 34903.70 square meters of medical technology building, 42547.50 square meters of inpatient building, 5018.40 square meters of infection control center, 5018.40 square meters of physical examination center, 16258.80 square meters of emergency center, 6477.10 square meters of administrative center and 6477.10 square meters of logistics support, The garbage station is 200.00 square meters, the boiler room is 250.00 square meters, the gas pressure regulating station is 20.00 square meters, the switching station is 480.00 square meters, and the underground building area is 26976.30 square meters.
Pay attention to us, Subscribe to more free content 。.
It is expected that in the next step, it will enter the construction stage soon.
Focus on us, Subscribe to more free content At present, there are 10000-20000 houses, many schools and a large modern hospital in Xiaoxian county.