Due to the construction needs of Zhongkai expressway, China Power Construction (Guangdong) Zhongkai Expressway Co., Ltd.
2、 From October 30, 2021 to October 31, 2021, for the temporary closure construction of the main road of Changyi Road, passing vehicles are invited to bypass the surrounding roads such as South Outer Ring Road, South Outer Ring ramp and Changwang road.
The specific route shall be guided according to the on-site traffic signs.
temporarily close the right ramp of South outer ring road on Changyi road from October 27, 2021 to October 28, 2021, Please drive around Changyi Road, Sanxi Road, Xingwen road and other surrounding roads.
plans to temporarily close the right ramp of Changyi road and South Outer Ring Road on Changyi Road on October 27, 2021: I.
The specific route shall be guided according to the on-site traffic signs.
Please click the blue words above to join Zhongshan hometown group.
Source: Zhongshan news Click “watching” to tell more people ↓↓..