[city] traffic tips during the construction of Chongqing West Railway Station supporting project

The content of the article only represents the author’s point of view.

The copyright belongs to the original author.

Editor Li Yi, Yangfan operation Yi Jian, Liu Ge editor in chief for cooperation please add wechat: hi3344hi statement: except for the original content and special instructions, the text and pictures of the push manuscript are from the Internet and major mainstream media.

The bus stop is adjusted and the Huayan bus stop on the original Huafeng road is relocated to the new temporary road (see attached Fig.

will close Huafeng Road (the road connecting Huayu road and huayansi Road) from January 7 to June 7, 2022.

Welcome to the official account for comments or contributions.

2).

Vehicles in the direction of original huayansi Road (Fengzhong access road) to Huayu road via Huafeng road should be diverted: huayansi Road (Fengzhong access road) – Xinqu Avenue – South circular road of Chongqing West Railway Station – Fengzhong road – Huayu Road (see attached Fig.

Fixing Socket Waved End

The relevant information is as follows: Vehicle diversion route 1.

3.

Due to the construction needs of the supporting works of Chongqing West Railway Station, Chongqing West Railway Station Investment Development Co., Ltd.

The trucks from Huafeng road to huayansi road or Huayu road should be diverted: Huayu road – Longmen array Avenue – Hualong Avenue – huayansi Road (two-way).

Welcome to forward and share…

2.

During the construction period, the majority of drivers are requested to strictly abide by the road traffic safety law and relevant traffic restriction measures, consciously obey the command of traffic patrol police and traffic coordinator, and pass according to the instructions of traffic signs.

3).

Vehicles in the direction of the original Huayu Road pass through Huafeng road to huayansi Road Please change the direction of Fengzhong access road: Huayu road – Fengzhong road – newly built temporary road – huayansi Road (Fengzhong access road) (see attached figure 1).

In order to ensure the safety and order of road traffic during construction and reduce the impact of construction on the traffic travel of the general public, According to Article 39 of the road traffic safety law of the people’s Republic of China, the traffic management department of the public security organ will adjust the traffic organization of huayansi Road, Fengzhong access road and Huayu road.

If you think the content is infringing, please contact us to delete it.

Please understand and support the inconvenience caused by the construction to the general public.