Closed construction! Fuyang people, please pay attention!

Spread well known! Tell more people! Reporter: Chu Jiming..

According to the information from the municipal key project construction management office, in order to promote the black and smelly water treatment project in Fucheng, luojiagou Fuwo road box culvert project will be implemented in the near future.

During the closed construction period, pedestrians and vehicles can bypass luojiagou road and Jihe North Road.

It will be closed for about three months each.

Shuttering Magnet

Because the pipe culverts can not meet the drainage, it is planned to dismantle the original Fuwo road bridge and build a new river crossing box culvert.

The closure date is from December 27 this year to July 31 next year.

It is a north-south alternating semi closed construction.

It is necessary to carry out half closed construction at the intersection of luojiagou and Fuwo Road (North and south of Chengxiao middle school).

In addition, there are pedestrian and battery car (bicycle) access roads at the intersection of luojiagou and Fuwo road.

First, the road on the west side of the central barrier will be closed.

It is understood that luojiagou Fuwo road box culvert project is located at the intersection of luojiagou river channel and S202 Provincial Road (North Woyang Road), adjacent to Yingdong Road (Guquan Road) in the north, The lower part of the original Fuwo road bridge near Beijing Middle Road in the south is drained through three 1m diameter reinforced concrete circular pipe culverts.