How to win the respect of Party A and the construction unit when doing supervision?

I.

Make the supervision work predictable.

Strive to improve the authority of supervision and strengthen supervision.

Only by doing well in flexibility can the supervision work be carried out coordinately and effectively.

If the supervisors do not seriously familiarize themselves with the drawings, do not grasp the characteristics of project construction, do not seriously sum up experience and actively help them, if they want the construction unit to have enough trust in us, it will be difficult to listen to our opinions and suggestions in the construction process.

Think of one or two steps in advance as much as possible, predict what problems may occur, and prevent them in the end.

Bold management and adherence to the principle are the basic qualities that the supervision engineer must have.

5.

Due to various reasons, the society has different opinions on the supervision work.

Secondly, we must master the documents related to the construction of the project.

Ensure the timeliness of supervision work.

At the same time, we still need to strengthen our own learning, improve professional knowledge and improve the level of supervision.

In addition to correctly handling the relationship with the owner, a good working relationship with the construction unit is also indispensable..

establishing a good image of supervision engineer is the premise of doing a good job of supervision.

The problems existing in the project of the construction unit shall be found in time and the rectification opinions shall be put forward in time.

Only by mastering these documents can we know well about the supervision of the project, deal with problems reasonably and get twice the result with half the effort.

The team of the project department is basically a temporary combination, and does not trust or pay enough attention to the supervision under the current background.

It is also an industry with high technical content, wide knowledge and great responsibility.

Obtaining the trust of the owner and the construction unit is the basic guarantee for doing a good job of supervision.

Speak with facts to make the construction unit have a good impression on the supervision, so as to lay a solid foundation for the supervision.

II.

correctly handle the relationship with the construction unit.

The construction unit is generally unwilling or unwilling to rectify.

Achieve the initiative of supervision work, and the supervision work shall achieve “four diligence”, namely brain diligence, leg diligence, hand diligence and mouth diligence.

Corn Magnetic Box

III.

If you want to do a good job in project supervision, you must constantly learn relevant national and industrial regulations, specifications and documents, take laws and regulations as the criterion and contracts as the basis, constantly learn professional knowledge and continuously improve the on-site management level, which is the primary condition for doing a good job in supervision.

We should understand the problems in essence and analyze the various factors causing the problems.

It is not feasible to have a loud thunder and a small raindrop; It will leave sequelae for future work.

1.

Make a conclusion after making it clear, so as to avoid mistakes and affect the supervision image.

2.

At this time, the supervision personnel must adhere to the end and follow up, Cooperate with the supervision engineer to veto the measurement and payment, so that the existing problems can be rectified in place.

The supervision engineer can not only supervise according to laws and regulations, relevant specifications and contract requirements, but also deal with general emergencies and confirm whether it is necessary to report to the chief supervision engineer for handling.

3.

4.

Problems in the construction process must be found and handled in time to avoid the continuous occurrence of problems.

IV.

Research problems should be thought from multiple angles and considered from multiple aspects, and examined from multiple aspects such as the owner, the construction unit and the supervisor, so as to avoid one sidedness.

Use national laws and regulations and superior documents to standardize the construction behavior of the construction unit.

If they are not handled in time or improperly, they will cause hidden dangers to the project quality or safety accidents such as personal casualties.

As a supervision engineer, we should start from me, strict requirements, take practical actions to maintain our professional dignity and establish a good image of the supervision engineer.

During the project construction, some unforeseen problems will occur due to human or mechanical equipment failure.

to do a good job of supervision, the following principles must be adhered to.

Pay close attention to the acceptance of concealed works, and carry out the next process after the rectification of unqualified subdivisional works.

Strive to do a good job in advance control and in-process control, and strengthen on-site inspection.

Therefore, we should consider the problems in combination with the reality of the construction site and construction environment, Instead of dealing with problems divorced from the actual situation.

Improving professional knowledge, being familiar with the characteristics of project construction and carrying out supervision with a serious and responsible attitude are the fundamental guarantee for doing a good job of supervision.

We should not be rigid in the treatment, because the geological conditions, construction environment and construction conditions of each place are different, and even the same place has different specific conditions.

In the process of project supervision, the construction unit often organizes construction according to its own experience, which requires our supervisor to play an important role in communication, coordination and guidance, and actively contact the owner and the design unit to avoid unnecessary rework, shutdown and delay of construction period.

Insist on planning first and pre control first, take safety production and project quality as the control focus, and take “frequently occurring diseases” and “common diseases” in project management as the focus of supervision pre control.

Engineering supervision is a very important link in engineering construction.

It is better to point out the possible problems in advance and not make them happen than to remedy them afterwards.

As the saying goes, “prevention is better than rescue”.

Achieve the flexibility of supervision work, and pay attention to the flexibility of methods on the premise of adhering to the principle.

Supervision pre control not only includes macro pre control, that is, it does not violate the principles on major issues and conforms to the regulations and specifications, but also pays attention to every detail on a micro level.

If problems are found, don’t talk nonsense.

Only by doing the above “four diligence” well and taking the initiative, can we ensure the quality of supervision and reduce mistakes in work.

That is, we should think, check, patrol and understand the construction site frequently, and ask and record the questions frequently.

On site supervision shall be adopted for key processes, and four timely measures shall be taken: timely discovering quality and safety problems in construction; Put forward existing problems and treatment measures to the construction unit in time; Make written records in time; Report relevant information to relevant departments in time.