This spirit of selfless dedication, facing difficulties and resolute action is worthy of our study and admiration.
2 standby water source point is temporarily suspended.
Phase II of water storage tank at No.
The tap water construction project is funded by the village.
1 water source point (Boqun , shooting) , pre purchase of water pipes , arrival of water pipes on December 25, 2021 , arrival of water pipes (Yucheng , shooting) equipment distributed by water pipe suppliers (Huanzhen shooting) phase III , installation of water pipes , installation of water pipes , December 26, 2021, The operation in the high mountains and very complex geographical environment brings great difficulties and challenges to the installation and construction of water pipes.
In the first stage of the construction of water storage tank at No.
The independent construction started on November 21, 2021 (called “1121 project”), and now the construction progress of the project is introduced.
The construction personnel (villagers Huanzhen and Boqun) overcome all difficulties and are not afraid of hard work to contribute to the construction of water supply in the village.
1 water source point was completed on December 17, 2021, and the construction of No.
*** Water pipe construction (photographed by Huanzhen and Boqun) water pipe on-site welding (photographed by Huanzhen and Boqun) segmented water source inspection (photographed by Huanzhen and Boqun)..
1 water source point in the water source area of lofty mountains (Huanzhen shooting), the construction of water storage tank at No.
Since the drinking water in the village can not meet the current living needs, the tap water construction is carried out according to the collective negotiation of the village.