Shenyang Metro Line 4 Lot 14 construction daily 2022 / 1 / 2

Construction progress: the section from Hongchun Road station to Urban Construction Institute station: ① 2# connecting channel pump house, 1 steel grating is erected (6 operators); Hongchun Road Station: ① formwork installation of the second section of rail top air duct of the right line (4 operators); ② Installation of internal 4# formwork (3 operators); ③ Reinforcement binding at the outlet (2 operators); ④ Formwork installation of the third section of the air duct at the top of the right track (3 operators).

Ringlock Standard Parts

Operation scenario: ① 2# connecting passage pump house steel grating erection ② right track top air duct second section formwork installation ③ internal 4# stair formwork support installation ④ reinforcement binding machinery and personnel allocation at the outlet: auxiliary operation team: 12 operators (12 operators at Hongchun Road Station); Contact channel operation team: 6 operators; Site mechanical equipment: one 10t Gantry Crane and one 45t gantry crane; 1 truck crane; 1 air compressor; 1 grouting machine; 1 excavator…

On January 2, 2022, November 30 of the lunar calendar, the weather is fine, the temperature is: – 17 / – 3 ℃, and the southwest wind is level 3.