The latest ground heating construction contract in 2022

Secondary acceptance.

Lay heating pipe.

Responsibilities and obligations of Party B: 1.

Article 3.

after the acceptance is qualified, the acceptance certificate shall be jointly signed.

The total cost of the project is about 200 yuan.

Party B shall ensure that the project is completed according to the agreed construction period.

Project cost: the floor heating laying and installation part of the project is calculated at ¥ / m2 (including installation, pressure suppression, testing and other expenses), and settled according to the actual laying area.

The intermediate acceptance shall be carried out in batches, and the parts completed on the same day shall be accepted on the same day.

Party B shall carry out construction in strict accordance with relevant regulations, terms of this contract and relevant matters specified in the design scheme.

6.

Actual laying area: About______ 10000 square meters.

(3) .

Article 2.

When Party B’s materials enter the site, Party A shall prepay 30% of the total project cost; 95% of the total project cost shall be paid after the project is accepted; The remaining 5% of the project funds shall be used as the project quality deposit, which shall be paid off after the second heating period is completed and the re inspection is qualified.

The floor heating system of the project is guaranteed for two heating periods.

Click the blue word to pay attention to us in case of emergency ~ Jinniu floor heating installation contract Party A: Party B: in accordance with the economic contract law of the people’s Republic of China, the regulations on construction and installation project contracting and relevant regulations, and in combination with the specific conditions of the project, With full knowledge of the materials and installation process, this contract is signed by both parties through consultation for both parties to abide by.

Article 9 responsibilities and obligations of both parties: 1.

II.

Laying fine aggregate concrete filling layer.

2.

Spread Anchor

Insulation layer: 25mm thick cement foam is used.

The heating pipe is directly fixed on the insulation layer with ∪ type clip nails.

PPR branch pipe, high-quality copper ball valve, PPR internal and external wire direct pipe fittings, casing, etc.

Before formal acceptance and delivery to Party A, all construction sites and finished materials shall be kept by Party B.

Party B shall strictly obey the supervision and guidance of Party A’s site representative, project supervisor and general contractor on project construction.

Article 8 payment and settlement of project funds: the project shall be settled according to the actual quantities.

In case of damage or loss, Party B shall no longer be responsible.

7.

Party A and Party B shall appoint Site Representatives to be responsible for the quality supervision, management, cooperation and coordination of the project.

Article 5 design and construction: Party B shall carry out careful construction, contract labor and materials, commissioning and maintenance according to the heating construction drawings, joint review records and drawing change opinions agreed by Party A and Party B to ensure that the design requirements are met.

Party a must conduct acceptance in accordance with the acceptance terms and time specified in the contract.

Project overview 1.

5.

2.

If the construction period is delayed due to special reasons and construction conditions, the construction period of Party B can be postponed after being signed by Party A.

Water separator: ___________________.

3.

2.

3.

2.

4.

3.

Pipe: heating pipe designated by Party A as_____________________ 2.

(2) Project content: installation of water separator (open installation), laying of insulation layer, laying of heating pipe, pressure suppression, etc.

Article 7 acceptance and finished product protection: 1.

Cement foam insulation layer.

2.

Party B shall compensate for the losses caused to users due to Party B’s installation or maintenance delay.

As the project needs to be carried out with other construction units, Party A shall properly coordinate Party B’s construction in other construction arrangements to ensure the smooth progress of construction.

Party B shall strictly implement the warranty items specified in this contract.

Project scope and content: (1) project scope: floor heating installation of indoor part (including indoor water separator).

Project quality assurance commitment: Party B shall provide accident liability insurance for the project, with a underwriting period of 25 years, a compensation limit of 250000 yuan per accident and a cumulative compensation limit of 1 million yuan.

Cement: 32.5R ordinary silicon hydrochloric acid cement} 5.

Project location:_______________________  。 3.

Article 4 construction material requirements: 1.

Party A shall provide Party B with necessary construction conditions such as construction site, water and electricity.

The third acceptance is completion acceptance.

4.

2.

If it fails to meet the requirements after acceptance, Party B shall rework unconditionally.

Each unit shall assign special personnel to take charge of the intermediate acceptance and completion acceptance.

The second pressure test and acceptance shall be carried out two days after the curing period of the filling layer expires.

The auxiliary materials are general materials on the market.

Conduct pressure test in the middle and keep the system under pressure.

4.

Project name: ______________.

If the acceptance is delayed due to the acceptance personnel, the construction period delay or other losses caused by it shall bear the corresponding economic responsibility.

The acceptance shall be jointly carried out by the supervisor and civil engineering party organized by Party A.

5.

4.

backfill the ground.

The project is constructed under pressure, and two pressure tests and three acceptance tests are carried out.

Party A and Party B shall jointly abide by the relevant provisions of the bidding documents.

4.

1.

Project duration: after the construction conditions are met, the commencement time shall be determined by_______ Further notice and_____ Within days.

Article 1.

3.

The first pressure test and acceptance are intermediate acceptance, which shall be carried out after the laying of heating pipe and before the pouring of filling layer.

Article 6 construction method: the construction organization scheme approved by the supervisor shall be implemented.

If the construction period is delayed due to Party B, the economic losses caused by other project delays shall be borne by Party B..

Clip, adhesive tape.

1、 Responsibilities and obligations of Party A: 1.

After the second acceptance, the protection of the system shall be coordinated by Party A and the civil engineering party.