4.
Do not wear plastic soled shoes.
First remove the frost and snow accumulated on the scaffold to ensure that there is no open water on the scaffold body, then climb up for operation, and pay attention to sliding.
Pay attention to the safety of anti freezing and anti condensation of construction machinery and equipment.
Sufficient fire-fighting equipment shall be set in the inflammable stacking area.
10.
3.
There shall be no inflammables near the inflammable materials, and it is forbidden to use open fire near the inflammable materials.
The high-altitude operation time should not be too long.
In order to prevent fire, it is again emphasized that smoking is strictly prohibited on site.
In case of rain, snow and other bad weather, it is strictly prohibited to forcibly organize construction operations, especially hoisting operations in rainy, snowy, windy and foggy weather; After frost, rain and snow, the working surface shall be cleaned in time.
5.
It is strictly forbidden to use water for construction in winter, and there shall be no ponding on the construction operation surface of the construction site, so as to prevent potential safety hazards and personal injury caused by slipping after freezing~~ It is recommended to read ~ ~ key points of road landscaping of municipal engineering.
At the same time, it is strictly prohibited to wear gloves when operating mechanical equipment such as bench drill and electric drill.
The cable laying shall be anti smashing, anti rolling and prevent the wire from freezing in ice and snow.
It is strictly prohibited to misappropriate the fire-fighting equipment.
The safety belt must be fastened for high-altitude operation to ensure that the safety belt is hung high and used low.
Each team shall focus on vehicle injury, prevention of electric shock and prevention of falling from height, strengthen the safety education for personnel working at night under adverse weather conditions such as fog, wind, rain and snow in winter, and add safety measures under corresponding special construction conditions in the safety disclosure of the team.
Anti freezing measures shall be taken for construction water and domestic water pipelines on site.
Before operation, pay attention to check whether there is frost and snow or condensed water on the scaffold.
Before work, carefully check whether the protective articles to be worn are intact and in place as required.
Therefore, it is necessary to prevent the clothes from being twisted into the mechanical equipment during the construction process, resulting in personal injury.
7.
The inflammables used on site shall be stacked specially, and the stacking distance of inflammables shall comply with the fire prevention regulations.
The electric mattress for personal use should be turned off when people walk, so as to prevent fire accidents caused by short circuit of power supply.
9.
Violators shall be punished to ensure that the fire-fighting equipment is in place.
All construction machinery and equipment in use shall be maintained in combination with routine maintenance, and replaced with lubricating oil and hydraulic oil suitable for cold season.
8.
Do you understand the differences between joint review of construction drawings, design disclosure and technical disclosure, and how to select the three connection modes of key reinforcement, which parts cannot be welded or bound, and the reserved positions of concrete structural walls, columns and mass construction joints.
1.
The damaged parts of the cable must be treated with waterproof insulating tape.
Pay attention to anti stranding.
It is cold in winter, and the construction personnel wear thick and long clothes to keep out the cold.
There are four principles..
2.
After heavy wind and snow, the electrical lines shall be checked to prevent electric shock caused by cable disconnection and damage.
6.
The temporary supports and edge protection facilities used must be checked and qualified by the safety management personnel before they can be used again, so as to prevent falling accidents caused by too slippery site caused by frost, rain and snow.
Electric stoves, iodine tungsten lamps, high-power bulbs and other means of heating are prohibited in the dormitory.
Strictly implement the hot work permit system.
Operators at heights must wear anti-skid and anti freezing measures such as anti-skid shoes and protective gloves, and correctly wear safety helmets and safety belts as required.
More than three damaged parts of the cable shall not be put into use.
It is strictly prohibited to use bare wires.
In winter, the environment is dry and dry, and the fire and power consumption increase.