Detailed explanation of construction operation standards and inspection standards of socket and turnbuckle scaffold

Knock the bolt of not less than 0.5kg with a hammer to ensure that the exposed tail of the bolt is not less than 15mm.

The length of the base plate shall not be less than 2 spans.

The socket and turnbuckle steel pipe # scaffold # sold and produced by Anhui Jianlian is a self-locking in-line steel pipe scaffold, which is significantly higher than the traditional cantilever external support in terms of erection and disassembly efficiency, reliability, safety and cost saving.

3、 The inspection and evaluation of socket and turnbuckle steel pipe scaffold support shall comply with the following provisions: (I) special construction scheme shall be formulated in the construction of construction scheme, and structural design calculation and review and approval of special engineering scheme shall be carried out.

(4) The distance between vertical poles and the step distance of cross bars of the fixed pole frame must meet the requirements of the design and specifications; The pole terminal block shall be set horizontally, longitudinally and horizontally according to the step distance designed by special engineering; The horizontal pole layer of double row scaffold has no hook steel scaffold board, and the horizontal inclined pole shall be set according to the specifications.

Ms.

The inspection and evaluation of general items of plug-in disc steel pipe scaffold shall comply with the following provisions: (1) the support protection shall be sealed with sealed safety net outside the frame, and the space frames shall be closely connected; The working face shall be provided with protective railings according to the specifications; The toe board shall be set outside the working layer with a height of no less than 180mm; The lower part of the scaffold board of the operation layer shall be covered with a safety flat net, and the lower end shall be covered with a safety flat net every 10m.

General items include: protective frame, rod connection, component material and channel.

The company takes Tianjin Jiulong, a leading enterprise in China’s buckle production, as a strong partner, and is determined to provide scientific, safe and efficient scaffold support schemes for construction enterprises in East China, so as to contribute to the realization of the Chinese dream of China’s construction industry.

(3) Support stability the tie between the bridge and the building structure shall meet the specification requirements, starting from the first level cross bar at the bottom of the frame, and fixed with other reliable measures when installation is difficult; The pulling node of the frame body shall be firm and reliable, and the connecting wall parts shall adopt rigid rods; The setting of vertical diagonal tie rod and shear support of the frame shall meet the specification requirements; Both ends of the vertical inclined rod are fixed on the longitudinal beam, and the buckle plate node where the transverse horizontal rod and the vertical rod cross; The diagonal tie rod and cross bracing shall be set continuously along the height of the scaffold, and the angle shall meet the specification requirements.

(Anhui Jianlian is a large leasing enterprise of Pankou scaffold and building formwork in Anhui Province.

Anhui Jianlian has strong material reserve, transfer site, developed logistics distribution system and strong after-sales service system..

The clearance between the inner diameter of the sleeve and the outer diameter of the riser pipe shall not exceed 2mm.

Scaffold construction I.

However, for the construction of plug-in steel pipe fasteners, as well as its own safety inspection standards, today we will learn about it.

Outside the scaffold, toe boards and protective guardrails are set outside the construction layer, and the dense mesh safety net is hung outside the scaffold.

The connecting sleeve between the vertical rod and the vertical rod is provided with a fixed vertical rod to prevent the pin from being pulled out, and the diameter of the pin hole shall not exceed 14mm.

The erection height of steel pipe scaffold supporting turnbuckle shall not exceed 24m.

(2) The extension position of the vertical rod of the rod shall meet the specification requirements, and the length of the shear support joint shall meet the specification requirements.

of the frame.

Flat End Socket

(5) Scaffold board the materials and specifications of scaffold board shall meet the specification requirements; Scaffold board shall be laid tightly, flat and firmly; The buckle hanger of the hanging buckle steel scaffold board shall be completely hung on the cross bar and locked with a hook.

It has complete services in the whole process of Pankou scaffold sales, matching, technical design and construction.

The length of vertical rod connecting sleeve shall not be less than 90mm and the insertion length shall not be less than 75mm; The length of the connecting sleeve of the vertical rod shall not be less than 160mm and the insertion length shall not be less than 110mm.

If there is no scaffold board on the working floor, a horizontal inclined rod shall be set according to the regulations of the specification.

The erection and use of the frame body shall be carried out in sections.

The vertical rod connecting sleeve can be cast steel sleeve or seamless sleeve.

(6) Before proposing and accepting the erection, safety technical disclosure shall be made, and written records shall be made.

The inspection and evaluation of socket and turnbuckle steel pipe scaffold shall comply with the current industrial standard jgj231 technical code for safety of steel pipe support in building construction.

Construction of turnbuckle scaffold IV.

An inclined rod shall be set every 5 longitudinal intervals on each floor outside the frame, or the end span of buckle steel pipe cross bracing shall be set between every 5 spans, and a vertical inclined rod shall be set on each horizontal floor.

The acceptance shall have quantitative contents and signed by the responsible person for confirmation.

The company’s contact number is 0551-65556218.

(3) The specifications, models and materials of frame components of building materials shall meet the specification requirements; The steel pipe shall be free of serious bending, deformation and corrosion.

The acceptance procedures shall be handled after the erection.

The outer surface of the thread shall be consistent with the inner surface of the end buckle of the cross bar and inclined bar.

The form of cast steel sleeve shall be adopted.

(2) Pole foundation pole foundation shall be leveled, compacted and drained according to the design requirements; The base plate and adjusting base must be set at the bottom of the vertical pole of the soil foundation and meet the specification requirements; The setting of frame longitudinal beam and sweeping rod shall meet the specification requirements.

Hu) who can I find for Pankou scaffold leasing? Anhui Jianlian mechanical equipment Leasing Co., Ltd.

2、 The inspection, evaluation and assurance items of socket and turnbuckle steel pipe scaffold include: construction plan, frame foundation, frame stability, frame installation, scaffold board installation, commissioning and acceptance.

It served more than 20 projects in 2021 and won wide praise from partners.

is a new template turnbuckle scaffold leasing company in East China.

Both ends of the vertical inclined rod are fixed on the longitudinal beam, and the transverse horizontal rod and the vertical rod cross the buckle plate node.

An adjustable base shall be set at the bottom of the vertical pole, and a base plate can be padded at the bottom of the vertical pole.

When the difference between the base and the base is too large, it can be adjusted by adjusting the base so that the same cross bar connecting plate on the adjacent vertical rod is installed on the same side.

(4) The special channel shall be set for personnel to go up and down, and its setting shall meet the specification requirements.

Draw the general layout, elevation, section, etc.