8、 The imperfections of this contract shall be settled by both parties through consultation.
♪..
♩~♫.
If the project payment is overdue for more than one month, the interest will be calculated based on the bank interest rate in the same period, and the combined interest will be paid to Party B.
♪~♬..
Party B shall make and install the window type according to the drawings provided by Party A and the national building standard design atlas) 06j607, which shall be signed and approved by the supervisor of Party A.
♩~♫.
6.
♪~♬..
2.
The glass shall be (5mm + 6A + mm) hollow glass.
We recommend a selection of beautiful articles to our friends every day, hoping to bring you a ray of peace after work, share the ball and praise the ball..
♪..
3.
The construction personnel shall take good care of the finished products.
♪~♬..
♪~♬..
(material sealing sample) 5 Other hardware (wool sample, pimp, lock, glue and foam) shall be sealed (sample is sent now) to meet the national standard.
♩..
♩~♫.
♩~♫.
In case of damage caused by the construction process, Party A may require necessary compensation or replacement.
♩♫.
7、 If the liability for breach of contract is caused by Party A itself, Party A shall be liable for compensating Party B, and if the liability for breach of contract is caused by Party B, Party B shall compensate Party A for its losses.
For the convenience of construction, Party A’s site representative is (Tel:), and Party B’s site representative is: IV.
4、 Construction coordination, finished product protection and construction safety: 1 Both parties shall cooperate closely to ensure the smooth construction of the other party on the construction site.
Disputes can be settled by both parties through negotiation.
♩~♫.
(material sealing sample) 4 The steel lining is 1.2mm (plus or minus 2%) hot-dip galvanized for rust prevention.
♩~♫.
♩..
(material sealing sample) the color is full gray, and the price is plus ten yuan.
this contract shall come into force after being signed and sealed.
♩..
♩~♫.
♪~♬..
3.
♪~♬..
♩..
The casement window adopts “Zhongcai” brand C-80 series profiles produced by Zhongcai collective Sichuan Zhongcai Pipeline Co., Ltd., with a wall thickness of 2.0mm.
2.
Click the blue word to pay attention to us for emergency needs ~ the employer of the door and window construction contract: (hereinafter referred to as Party A) the Contractor: (hereinafter referred to as Party B) in accordance with the contract law of the people’s Republic of China and relevant regulations, based on the principle of voluntariness, equality, good faith and mutual benefit, through joint negotiation between Party A and Party B, Reach the following terms for both parties to abide by: I.
♩..
♪~♬..
♩..
3、 Preliminary work 1 Party A shall provide Party B with a complete list of doors and windows, construction drawings and relevant data within 10 days after the signing of the contract.
If they cannot be negotiated, they can be settled through litigation.
♩~♫.
The materials or finished products entering the construction site shall be fully wrapped with protective film.
project overview 1 Project Name: II.
♩~♫.
♩ Daily reading Read to nourish your nature.
♩♫.
♪~♬..
Products must be provided with product certificate.
♩~♫.
Party A shall provide temporary power supply free of charge at the installation site.
♪~♬..
♩~♫.
♪~♬..
3.
♩~♫.
The construction cooperation requirements between Party B and Party A on the construction site shall be coordinated by Party A.
♪~♬..
♩♫.
2.
The contract price includes processing and installation fees, freight, testing fees and taxes.
♪..
construction period: days.
After entering the construction site, Party B shall obey the unified management of the construction site and necessary safety measures, and standardize the construction operation.
♩..
♩..
♪~♬..
Project content, cost and material requirements of plastic steel doors and windows: 1 The comprehensive unit price of plastic steel doors and windows shall be 230 yuan per square meter, and the specific quantity shall be subject to the drawings.
♪~♬..
9、 This contract is made in triplicate, two for Party A and one for Party B.
6、 The settlement of door and window works shall be summarized by Party B, approved by Party A, and the project payment can be paid only after being signed by both parties.
Party A and Party B shall strengthen the protection of finished products and civilized construction management.
4.
♩~♫.
♪~♬..
The plastic steel casement window profile is “Zhongcai” brand C-60 series profile produced by Zhongcai Pipeline Co., Ltd., with a wall thickness of 2.0mm.
♩~♫.
Party A shall timely inform Party B according to the civil construction progress on the construction site, so that Party B’s construction can be carried out in an orderly manner, and make mutual adjustment and cooperation.
♪~♬..
5、 Payment method: after the construction is completed, 20% will be paid after the installation of windows, 30% will be paid after the installation of glass, 45% will be paid at one time after the completion of the project, and 5% of the balance will be used as the maintenance fund, which will be settled at one time after one year.
Party A (seal): Party B (signature): Representative: date of signing: mm / DD / yyyy ♪~♬..
Glass installation shall be carried out after civil engineering and coating construction to avoid glass damage and pollution.
♩~♫.
♪..
5.
In case of safety accidents, the responsible party shall bear them by itself, and the safety accidents caused by Party B in the construction process shall be borne by Party B.
♩~♫.