[new wall] construction technology of new wall how thick is the new wall

Magnetic Steel Chamfer

In the process of decoration, cracks or cracks are often found in the wall.

According to the design requirements, the setting out shall be carried out along the ground, wall and top position to accurately ensure that the partition wall is vertical.

Since the walls of houses are built according to scientific calculation, if you want to increase the volume and weight [detail] what are the reinforcement methods of load-bearing wall? The bearing wall is the most important supporting structure of the building.

The new wall needs staggered masonry, and reinforcement shall be used at many joints with the load-bearing wall to increase the firmness of the wall and avoid cracks in the corner.

As a skeleton partition wall, the keel frame shall be built first.

Pay attention to sound insulation.

Although the cracks are small ··· [details] paying attention to the anti-seepage of the wall and creating romance is the highlight of home decoration.

Its function is to load, enclose or separate space.

The newly-built wall of house structure transformation is also a method to change the indoor space pattern.

If you need to build a wall with large volume and weight, it is necessary to pass the approval of the original design department and the property.

How thick is the new wall? How to calculate the new wall area? Attention shall be paid to crack prevention in the construction details of the new wall.

The wooden keel is fixed with wooden screws, and the fixed gypsum board cannot be connected with steam nails.

The wire mesh shall be hung on the outside of the new wall before plastering cement, so as to increase the stability of the wall and the tiles outside, and avoid cracking of the new light wall and falling off of the plastering layer.

What are the classifications of walls? Wall is an important part of a building.

The gypsum board of partition wall should be laid vertically along the keel, the long side joint is on the center line of the vertical keel, and the joints of gypsum board on both sides of the keel and double-layer board on one side of the keel should be staggered.

New wall technology decoration new wall classification and construction technology new wall of house structure transformation is also a method to change the indoor space pattern, new wall [details] how thick is the load-bearing wall? What is the minimum thickness? The load-bearing wall is a wall supporting the upper and lower structures in a house, but the thicker the better, because it is too thick [details] the method of building a new wall and the sound insulation and thermal insulation materials of the wall can save a lot of wall materials, improve the thermal insulation performance of the wall, save resources and reduce [detail] how to deal with the sound insulation of the wall? In the sound insulation construction of the wall, we simply divide the wall into high-density wall and light wall, and choose sound insulation materials [details] common materials and key points of construction of new walls.

In addition to exterior walls, interior walls and gables, what are the classifications of building walls······ [details]..

To avoid overweight, considering the load-bearing problem, generally new walls are made of light partition walls and relatively light materials.

The cracks and cracks of these walls are caused by many factors, including the environment, the quality of the building itself and so on.

100x300x600 aerated brick bucket masonry is commonly used for large-area soft masonry partition wall with light brick.

For the newly-built wall of house, we should pay attention to distinguish which wall and what the construction technology of various walls is, so as to ensure the smooth construction of wall.

It can strengthen the support of the bearing wall and make the building [details] wall treatment and house reinforcement methods house reinforcement can be described from two aspects: one is maintenance reinforcement due to house damage; Second, how to deal with the wall cracking in order to make the house reach a certain anti-destructive capacity, such as anti earthquake capacity.

The owner also needs to pay attention to the possible deformation of the new wall.

When laying pipelines for plumbing and electrical equipment embedded in the wall, the horizontal and vertical keels shall not be cut off.

For a toilet with ingenious conception and careful care, in addition to pleasing to the eye, please pay attention to the details of the treatment of wall anti-seepage, drainage and floor drain, so as to avoid future troubles.

It can be filled with benzene board or rock wool in the keel as much as possible without gaps, and foam bricks or other materials with good thermal insulation can be used as thermal insulation layer.

Generally, the partition wall in the room needs sound insulation, and the balcony wall of the outer wall needs wall insulation.