Only Lishui road crosses East and West in the area, resulting in long-term traffic inconvenience.
At present, there is only one lane of hardened pavement, which is the only way for Qingling community and Shimen church.
This section has not been repaired for many years and is seriously damaged at present.
▎ related works in previous periods: Baishazhou Humanities: Church beside Qingling lake, heavyweight, Hongshan high school, settled on the East Bank of Qingling lake..
After the completion of Qingling Hubei Road, it will also play a positive role in promoting the construction of Hongshan high school.
Recently, Qingling Hubei Road (Qingling River Road Baishazhou Avenue) road and drainage project issued a bidding / prequalification announcement, with a total investment of 208162900 yuan and a planned construction period of 582 days.
In addition, residents on the West Bank of Qingling do not need to go around Daoli waterway when they go to the subway entrance, which can save a lot of time and bring convenience to residents’ travel.
Qingling Hubei road is located in Qingling street, Hongshan District, east-west, starting from wujindi highway in the West and Baishazhou Avenue in the East, with a total length of 2600m and a width of 30m.
The total length of this implementation is 1345.921m.
The road to the east of Qingling lake is unspeakable.
After the construction of this section of road, qinglinghu road will be connected across the whole line, become the second east-west road in Qingling area, and optimize the regional traffic network.
On the south side of Lishui Road, Qingling Hubei road is planned to be parallel to it.
The road grade is urban secondary trunk road, with a design speed of 40km / h, two-way four lanes and a red line width of 30m.
It can be implemented only after a map of the road red line is adjusted.
It is reported that the project starts from Qinglinghe road in the West and Baishazhou Avenue in the East.
— Qingling Hubei Road West of Qingling River Road at present, Qingling Hubei Road West of Qingling River Road has been completed and opened to traffic, and will be blackened and upgraded, but the section from Qingling River Road to Baishazhou Avenue has not been repaired.
Qingling is 7 kilometers north of Hunan, which divides Qingling Street into East and west parts.
After the whole line is connected, it can also connect the two banks to play the role of diversion.
The construction content of the project is: about 27486 square meters of new motor vehicle roads, about 4134 square meters of non motor vehicle roads and about 7296 square meters of sidewalks; Build a new rainwater and sewage main road of about 2670m, and reserve planned interfaces and household branch pipes at the crossing and along the line; Simultaneous implementation of traffic, greening, lighting and other ancillary works.
The qinglinghu campus of Hongshan high school, which has been settled in the south of this section of road, will recruit students in 2025.
Previously, the planned red line of this section of road occupied the red line of the original project due to the reconstruction of villages in the city, so the road has been unable to be constructed.