Responsibilities of constructors of Beiping Youjiao Business School

Lifting Anchor

The main task of constructors is to control and strengthen the whole process of their project construction implementation system.

IV.

The role of technology depends not only on the level of technology itself, but also on the level of technology management to a great extent.

III.

II.

construction schedule management project construction schedule management includes two parts: project schedule system and project construction implementation system.

Formulate monthly plan, weekly plan and daily plan; (2) According to the construction schedule, specifically arrange the organization relationship, process connection relationship, human, material, machine plan and other assurance plans to achieve the planned objectives; (3) Make plan disclosure to subordinate departments and implement responsibilities.

Construction technology management for construction projects, due to its single piece, open-air, complexity and other characteristics, determines that the role of technology is more important.

Review whether the drawings and data meet the requirements of construction organization, whether the relevant data and data used in the design are compatible with the construction conditions, and whether the construction quality and safety can be guaranteed; (2) Quality control of site preparation; (3) Quality control of material and equipment supply.

V.

(1) Be familiar with the contents of construction organization design, and understand the construction sequence, construction method, plane layout and technical measures; (2) Do a good job in the disclosure of construction organization design, and organize the safety and technical disclosure of construction teams; (3) Make preparations for the construction site.

construction organization and management ① organize professional constructors to carry out work in their respective working faces according to the construction schedule; ② Reasonably allocate materials and construction machines and tools during construction to ensure orderly construction flow; ③ Correctly handle various contradictions in space arrangement and time arrangement, so as to make the best use of people and things; ④ Organize and coordinate safety and technical disclosure activities and follow-up inspection of working face; ⑤ Prepare construction logs and fill in construction records.

construction quality management (1) organize the review of construction drawings and technical disclosure.

construction safety management is to reduce or eliminate unsafe behaviors and states through specific state control of production factors in the process of project construction, so as not to cause man-made accidents, especially accidents that harm people, so as to fully ensure the realization of the benefit objectives of the construction project.

Such as positioning and setting out of the house, removal of obstacles, four connections and one leveling, erection of various temporary facilities, etc; (4) Provide technical training for new technologies and processes.

(1) Implement the relevant regulations of the superior, supervise the implementation of safety technical measures and safety operation procedures, conduct written safety technical disclosure to the team according to the characteristics of production tasks, regularly check the implementation of disclosure requirements, and correct illegal operations at any time; (2) Organize and implement the three-level safety education, routine safety education and various forms of safety education according to the characteristics of each construction stage of the construction team under its jurisdiction; (3) Strictly implement the declaration and approval system for new materials, new processes and new technologies applied in the project, stop the construction in time if unsafe problems are found, and report to the leaders or relevant departments; (4) In case of work-related casualties and near miss accidents, the construction must be stopped, the site must be protected and reported immediately…

Job responsibilities of Beiping excellent education constructors I.

(1) Determine the construction progress objectives according to the requirements of the construction contract, clarify the planned commencement and completion dates and total construction period, and determine the commencement and completion dates of the project in stages and batches.