Selected cases of safe and civilized construction! I won’t make your mistakes. I’ll take the standard practice away!

The enclosure shall be firm, stable, neat and beautiful.

When the metal sandwich plate is used, the combustion performance grade of the core material shall be class A; The partition wall shall be separated from the floor base to the bottom of the roof base; 2.

Special smoking places shall be set up on the construction site, and smoking at will is strictly prohibited; 7.

The road on the construction site shall be smooth and the road surface shall be flat and solid; 3.

Meeting rooms, cultural entertainment rooms and other densely populated rooms shall be set on the first floor of temporary rooms, and their evacuation doors shall be opened in the direction of evacuation..

01 civilized construction 1.1 common problems and specification requirements of on-site enclosure: 1.

When the number of floors is 3 or the building area of each floor is greater than 200 ㎡, at least 2 evacuation stairs shall be set, and the maximum distance from the room evacuation door to the evacuation stairs shall not be greater than 25m; 4.

Construction personnel shall wear work cards when entering the construction site; 4.

Fire prevention, rust prevention, rain prevention and other measures shall be taken for the stacking of materials on the construction site; 4.

A guard duty management system shall be established and guard duty personnel shall be provided; 3.

There should be bulletin boards, newspaper reading boards and blackboard newspapers.

The operation area, material storage area, office and living area shall be clearly divided, and corresponding isolation measures shall be taken; 2.

Standard practice 1.5 common problems and specification requirements of on-site office and accommodation: 1.

Standard practice 1.3 common problems and specification requirements on the construction site: 1.

Construction in progress, kitchen and warehouse shall not be used as dormitory; 3.

The number and layout of facilities in the toilet shall meet the specification requirements, and the toilet must meet the sanitary requirements; 5.

Closed enclosure with a height of no less than 2.5m shall be set at the construction site of main urban sections; 2.

Dust, noise and light pollution prevention measures shall be taken at the construction site; 4.

When rooms are arranged on one side, the net width of evacuation walkway shall be ≥ 1.0m; When houses are arranged on both sides, the net width of evacuation walkway shall be ≥ 1.5m; The net width of evacuation stairs shall not be less than that of evacuation walkways; 6.

Fixing Socket Cross Hole Nail Plate

The distance between canteen and toilet, garbage station, toxic and harmful places and other pollution sources shall meet the specification requirements; 3.

The dormitory shall be provided with openable windows, the bed shall not exceed 2 floors, and the channel width shall not be less than 0.9m; 5.

The fire rating of dormitories and office buildings shall meet the specification requirements; 4.

Standard practice 02 fire safety management on construction site 2.1 common fire prevention problems and specification requirements of dormitories and office buildings.

The gas tanks used in the canteen should be provided with separate storage rooms, which should be well ventilated and strictly prohibited from storing other items.

Standard practice 1.2 common problems and specification requirements of closed management specification requirements: 1.

Domestic waste shall be put into closed containers and cleaned in time.

Public signs shall be set at the gate, mainly including: Project Overview board, fire protection board, safe production board, civilized construction board, list of management personnel and supervision telephone board, and general layout of construction site; 2.

Measures for non disturbing residents during construction shall be formulated.

A health responsibility system should be established and implemented to each person; 2.

Construction can be carried out only after approval before night construction; 2.

Standard practice 1.6 common problems and specification requirements of public signs.

In summer, the dormitory shall be provided with heatstroke prevention and mosquito and fly prevention measures; 8.

The per capita area of accommodation personnel in the dormitory shall not be less than 2.5 m2 and shall not exceed 16 people; 6.

Standard practice 1.4 common problems and specification requirements of material management: 1.

The canteen must have a hygiene license, and the cooks must work with a health certificate.

The construction site shall be provided with drainage facilities, and the drainage shall be smooth without ponding; 5.

Standard practice 1.8 common problems and specification requirements of community service specification requirements: 1.

The building area of dormitory rooms shall not be greater than 30 ㎡, and that of other rooms shall not be greater than 100 ㎡; 7.

The combustion performance grade of building components shall be class A.

The entrance and exit of the construction site shall be marked with the enterprise name or logo, and vehicle washing facilities shall be set.

The construction site of general road section shall be provided with a closed enclosure with a height of no less than 1.8m; 3.

The construction waste in the building shall be transported by appliances or pipelines, and it is strictly prohibited to throw it at will; 5.

The distance from any point in the room to the nearest evacuation door shall not be greater than 15m, and the net width of the door shall not be less than 0.8m.

Dormitories and office rooms shall not be built in combination with kitchen operation room, boiler room, power transformation and distribution room, etc; 9.

It is forbidden to burn all kinds of wastes on the construction site; 3.

Inflammables and explosives shall be stored in a special warehouse by category, and fire prevention measures shall be formulated.

Greening shall be arranged in warm seasons.

Materials shall be stacked neatly and marked with name, specification, etc; 3.

There shall be safety slogans on the construction site; 4.

The construction site shall be provided with measures to prevent mud, sewage and wastewater from polluting the environment; 6.

Signs shall be standardized, neat and unified; 3.

The hygienic environment of the canteen should be good, and necessary facilities such as ventilation, refrigeration, disinfection, rat prevention, mosquito and fly prevention should be equipped; 4.

Building materials, components, materials and tools shall be stacked according to the general layout; 2.

The ground of main roads and material processing area on the construction site shall be hardened; 2.

Specification requirements: 1.

It is necessary to ensure the sanitary drinking water of on-site personnel; 6.

Heating and anti carbon monoxide poisoning measures shall be taken in the dormitory in winter; 7.

The number of building floors shall not exceed 3, and the building area of each floor shall not exceed 300 ㎡; 3.

Specification requirements: 1.

Dust prevention measures shall be taken on the construction site; 4.

The shower room shall be set to meet the needs of on-site personnel; 7.

Standard practice 1.7 common problems and specification requirements of living facilities: 1.

The entrance and exit of the construction site shall be set with gate and guard duty room; 2.

When the building area of the room exceeds 50m2, the net width of the door shall not be less than 1.2m; 8.

Daily necessities shall be placed neatly and the environment shall be clean.