Shapingba: closed construction!

From January 5, 2022 to January 15, 2022, the inner ring of Baijia interchange of Beltway will turn left out of the city ramp and turn left into the inner ring ramp for closed construction, and motor vehicles are prohibited.

Lifting Anchor

Turn left from the city through the inner ring, drive to the reception Temple interchange around the city, turn around, drive back to the outer ring of the ring expressway, turn right through the outer ring of Baijia interchange and leave the city on the ramp; The original left turn vehicle into the city drives to the Jincheng Lake interchange around the city through the right turn ramp into the city, and then turns around and drives into the inner ring of the city.

Source: Chengdu traffic control, click 「 below 」.