The construction knowledge of gypsum line makes the construction preparation more comprehensive

If it is too thick, the fluidity of paint surface is poor and the surface is uneven.

2、 Key points of gypsum line construction 1 The base course treatment is in place.

Do you understand the differences between joint review of construction drawings, design disclosure and technical disclosure, and how to select the three connection modes of key reinforcement, which parts cannot be welded or bound, and the reserved positions of concrete structural walls, columns and mass construction joints? There are four principles..

Therefore, it is necessary to understand the key points of construction preparation of gypsum line in order to complete the decoration~~ It is recommended to read ~ ~ key points of road landscaping of municipal engineering.

Only in this way can we ensure that there are few front joints and put less than half of them in inconspicuous parts.

4.

5.

Do not mix too much, otherwise it will harden.

The low parts need to be padded with gypsum, Clean the gypsum on the surface of the gypsum line with clean water to avoid being unable to clean in the later stage.

Scrape it evenly on both sides of the gypsum line, and then two people hold up the ink line on the wall below the gypsum line and hold it for 3 to 5 minutes.

The gypsum line repair needs painters to complete.

When is the gypsum line appropriate? Only when the grass-roots treatment meets the standard is an important premise to ensure that the gypsum line construction meets the standard.

It is easy to find that the dry floating is not beautiful.

Only these can ensure the early quality of later gypsum line construction.

3.

In addition, repair the top surface of the wall to ensure that the width of the gypsum line out of the wall is consistent.

If it is too thin, it is easy to fall.

During the connection, pay attention to whether the pattern is aligned and the height is consistent.

At present, many workers only brush two finishing coats.

Brush emulsion paint.

After the gypsum line is pasted, the painters repair the joint of the gypsum line again to weaken the joint, so that it is difficult to find it.

Mix the gypsum powder and level it where the joint is not sealed.

How can it be regarded as meeting the standard? Firstly, the wall surface must be inspected and renovated with a guiding rule.

It can’t go in and out suddenly and follow the wall.

Secondly, the gypsum line should be a line as a whole.

Construction sequence of gypsum line: construct the front first and start from the front.

If the height is not known, draw a small section of line on the top corner, then measure the length of the wall, saw the total length of the gypsum line with a hacksaw or knife, clarify the up and down of the gypsum line, erect the gypsum line, and saw both ends at a 45 degree angle, Mix the gypsum powder with water.

Secondly, the wall top surface has been puttied twice, and the visual surface is flat without protruding or concave parts.

During construction, it shall be adhered and adjusted quickly, fixed and adjusted at the same time.

This can prevent the installed gypsum line from falling off, and then snap the ink line on the wall at the top corner with an ink bucket.

2.

During construction, more workers are supervised.

Plastic Nail Plate

The thinness and consistency of paint mixing shall comply with the construction instructions.

The corners and joints are the most important parts of the construction.

6.

If wallpaper is pasted on the wall, wallpaper workers must be warned to scrub the wallpaper glue on the gypsum line and door pocket line during wallpaper construction, otherwise dark marks will be left on the emulsion paint in the future, which will affect the decorative effect of the emulsion paint.

After adjustment, the place to be repaired shall be filled in place in a short time, the place to be cleaned shall be cleaned in place, and then cleaned with clean water to ensure that the decorative surface is clean and tidy.

Normally, one primer and two finishing coats are applied.

Generally, the joints of the gypsum line must be scraped with gypsum, and then connected.

1、 For the gypsum line construction process, first clean the original putty powder at the parts to be installed, apply water with a roller and shovel it off with a shovel.

7.

Gypsum line is very important for the decoration process.