The latest decoration project construction contract in 2022: small tooling and home decoration

Party B contracts labor and some materials, and Party A provides some materials (see Annex: list of decoration materials provided by Party A, annex: list of decoration materials provided by Party B); Party B shall contract labor and Party A shall contract all materials (see Annex: list of decoration materials provided by Party A).

4.

Click the blue word to follow us, Construction contract for decoration works (type b) (gf-02-0206) prepared by the State Administration for Industry and Commerce of the Ministry of construction of the people’s Republic of China.

If Party A needs to dismantle or change the load-bearing and non load-bearing structure of the building, or dismantle and change the kitchen and sanitary positions, equipment pipelines and build the sunshine room, it shall be responsible for going through relevant approval procedures with relevant departments; According to the regulations of relevant departments, Party A has no right to require Party B to move or transform heating and gas pipelines; If Party A fails to go through the relevant approval procedures for the changes to the original buildings and site area, all consequences and responsibilities caused by Party A’s forcible request for Party B’s construction shall be borne by Party A; If Party A requires no waterproof, all consequences and responsibilities caused by water leakage shall be borne by Party A.

Both parties agree that the design and construction drawings shall be provided in the following way; 7.1 Party A shall design and provide construction drawings by itself.

Party B shall contract labor and all materials (see Annex: list of decoration materials provided by Party B); 2.

10.

7.

Party B shall strictly implement the national code for construction of Building Decoration Engineering during construction, ensure the project quality and complete the project on schedule.

Project contracting mode, Both parties agree to adopt the following {contracting method: 1.

Rights and obligations of Party A and Party B: Party A shall create conditions for Party B to enter the site for construction and remove obstacles affecting the construction two to three days before the commencement of construction; Be responsible for coordinating the relationship between the construction team and the neighborhood (units and departments) and paying the project payment on schedule.

7.2 Party A entrusts Party B to design the construction drawings in triplicate, with Party A, Party B and the construction team holding one copy respectively (see Annex: design drawings of Decoration Engineering).

5.

Party B shall strictly implement the municipal regulations on construction site management and shall not disturb residents and pollute the environment.

the designer of Party B is responsible for providing consulting, design, quotation and other relevant services to Party A.

The drawings and budget shall come into force after being signed by both parties.

Party A shall participate in the supervision of project construction progress and quality, and conduct acceptance confirmation of material mobilization and completion acceptance.

The valid period of project construction is {days; The commencement date is mm / DD / yyyy, and the completion date is mm / DD / yyyy.

Contract price ¥ (in words): 6.

Party A shall contact Party B’s project manager on relevant matters of the project to ensure the unified command and management of the project; If Party A designs and provides construction drawings by itself, the designer of Party A shall be responsible for providing relevant services such as engineering construction process consultation, design and quotation to Party B.

Before commencement, Party A shall provide Party B with water source and power supply during construction, and explain the precautions for use.

The design fee shall be paid by Party A (this design fee is not included in the project price); The design and construction drawings shall come into force after being signed by both parties.

all responsibilities caused by unclear engineering construction process provided by Party A to Party B shall be borne by Party A.

after the contract is signed, the representative of Party B performing the construction of the project is the project manager sent by Party B.

Foot Eye Anchor

8.

The drawings are in triplicate, and Party A and Party B’s construction team each hold one copy; (see Annex: construction drawings of Decoration Engineering) the design and construction drawings shall come into force after being signed by both parties.

The drawing submission time is mm / DD / yy.

Party A shall coordinate with relevant departments to do a good job in site security, fire fighting, garbage disposal, etc., and bear the corresponding expenses It is forbidden to dismantle the indoor load-bearing structure and build the sunshine room in violation of regulations.

Party B shall ensure the cleanliness of the construction site and be responsible for cleaning the construction site after the completion of the project; Party B shall bear the penalty and compensation liability caused by Party B’s violation of property management regulations during construction..

If Party A is unclear about the construction process of the project, Party B shall explain to Party A.

If the project is supervised, Party A and the supervision company shall sign a separate project supervision contract and notify Party B of the name, unit, contact information and responsibilities of the supervision engineer.

The construction deposit and various management fees collected by the property management department where the project is located shall be paid by Party A (except for the pass), and Party B shall assist in providing relevant materials required by property management.

Employer (hereinafter referred to as “party a”): residence (unit) Address: Tel.: mobile phone number: Project Supervisor of Party A and Tel.: Contractor (hereinafter referred to as “Party B”) Company address: designer of the project: contact number: Project Manager of the project: contact number: in accordance with the contract law of the people’s Republic of China In accordance with the regulations on contracting contracts for building decoration projects and in combination with the specific conditions of the project, both parties have reached the following agreement: Project Overview: Project Name: Project Location: 3.