The latest hydropower project construction contract in 2022 is officially completed in word electronic version

♩..

♩..

Article 9 rights and obligations of both parties: 9.1 Party A shall notify Party B to enter the site 2 days in advance.

Party B shall not use personnel under the age of 18 or bring children into the construction site.

(PVC pipe and copper wire) Article 7.

♪..

The remaining payment shall be paid in a lump sum one year after the project is completed and delivered for use.

♪~♬..

♩..

♩..

Article 2.

Article 8.

♩..

♩~♫.

Others: matters not covered in this contract can be supplemented by both parties through negotiation.

Click the blue word to follow us, Possible period of want or need ID number of hydropower project, installation and construction contract: date of signing: 2012, month, date, construction contract for water and warm installation, Party A (contract holder): body ID No.: Party B (Contractor): ID number: in accordance with In accordance with the contract law of the people’s Republic of China, the construction law of the people’s Republic of China and other relevant laws and administrative regulations, following the principles of equality, voluntariness, fairness, honesty and credibility, both parties have reached an agreement on the construction of hydropower installation divisional works of Shaanxi Tonghui environmental protection human Equipment Manufacturing Co., Ltd, Both parties shall strictly abide by: Article 1.

♩♫.

We recommend a selection of beautiful articles to our friends every day, hoping to bring you a ray of peace after work, share the ball and praise the ball..

♩ Daily reading Read to nourish your nature.

♩♫.

If the negotiation fails, they may bring a lawsuit to the people’s court where the project is located.

Article 6 construction quality: Party B shall carry out construction in strict accordance with the positioning, technical specifications and safety operation procedures of water, electricity and heating facilities marked on the construction drawings, and pass the acceptance according to the current construction acceptance specifications.

♩~♫.

Project location: Gaoling County, Xi’an City, Shaanxi Province.

♩..

Article 13 contract management: this contract is made in duplicate, with each party holding one copy, which has the same effect.

♪~♬..

♩~♫.

♩~♫.

♩~♫.

Lifting Insert

♪~♬..

Party B shall withdraw from the site by itself, that is, Party B shall give up all project funds and pay Party A’s losses.

♪~♬..

♪~♬..

♩~♫.

♩..

♪~♬..

♪..

After the main body is completed, Party A shall pay Party B 40% of the project payment according to the price in Article 7, After the project is completed and accepted, 7% of the project payment shall be paid to Party B in advance according to the price in Article 7, and the remaining 3% shall be used as maintenance deposit.

♪~♬..

Article 12.

♩♫.

♩~♫.

Contracting scope: the main structure in this design drawing needs to install water supply and drainage, strong current and heating hole reservation, embedding and installation.

Article 3 specific work content of contracting: Party B shall be familiar with the construction drawings, indoor water, strong electricity and heating installation works.

Party A: Party B: (seal): (seal): pasting place for copy of ID card from mm / DD / 201 to mm / DD / 201 , pasting place for copy of ID card , ♪~♬..

♪~♬..

Project name: part of hydropower installation project planned in the plant area of Shaanxi Tonghui environmental protection human Equipment Manufacturing Co., Ltd.

♪~♬..

Article 5 construction period of the contract: the total calendar days follow the construction period of formwork and plastering.

♪~♬..

♪~♬..

♩~♫.

Article 11 dispute: in case of any dispute between Party A and Party B during the performance of the contract, both parties shall negotiate and solve it in a practical and realistic manner.

Article 4.

♩~♫.

The above contents include labor cost, tool cost, machinery cost, sporadic iron wire and nail cost, labor protection (gloves, helmet, etc.).

♪~♬..

♪~♬..

♩~♫.

5.1 commencement date: Party A shall notify Party B to enter the site 2 {days in advance.

Project payment method: Party A shall pay Party B 10% of the project payment when Party B enters the site according to the price in Article 7.

2.

Contracting method: contracting labor and materials.

♩~♫.

♪..

♩~♫.

Article 10 breach of contract: both parties shall strictly abide by the contract law of the people’s Republic of China and all the provisions of the contract.

♪~♬..

♩~♫.

9.3 civilized construction: Party B must do a good job in civilized construction.

♩~♫.

♪~♬..

♪..

♩..

9.2 Party B must have a certain level of operation technology to ensure the number of construction personnel on the construction site and maintain the relative stability of construction personnel to ensure the smooth progress of the project.

Before entering the site, Party B must make safety education, civilized construction, construction technology disclosure, schedule and other disclosure to its construction personnel.

Project overview: 1.

Safety signs and helmets must be set up in specific construction operations to ensure safe and civilized construction.

If Party B does not cause construction errors after the contract is signed, Party A proposes to leave the site, and Party A shall pay all losses to Party B.

♩~♫.

♩~♫.

During the construction process, Party A shall pay Party B 40% of the project payment according to the price in Article 7 after Party B completes ± 0.

Material grade standard: non-national grade standard shall be followed.

The contract shall become legally effective after being signed or fingerprinted by both parties, and shall become invalid after the project is completed and the project payment is settled.

Calculation method of quantities and contract price: the price of water, electricity and heating works is calculated according to the calculation rules of building area, which is RMB (yuan / m2) per square meter of building area (in words), the total area is ¥ m2, and the total project payment (in words) (¥ yuan).