The person who has written the construction log is qualified to be the project leader

5.

The recorder shall sign and the leader in charge shall read and sign regularly.

How to record the construction log? First, understand the requirements for filling in the construction log: 1.

4.

Construction content and actual completion of the day.

Other inspection records must be specific and detailed, not general.

Mobilization and inspection of materials.

4.

Main contents of relevant meetings on the construction site.

4.

It has five main functions: 1.

Provide basis for engineering change; 4.

3.

2.

Only when we have an accurate understanding of the Construction Safety log, can we accurately grasp the compilation idea of the Construction Safety log..

3.

Ensure that the project can be traced effectively in the future (a good memory is better than a bad pen); 2.

Second, the contents to be recorded in the construction log shall be clear.

5.

The construction safety diary has a very important position in the whole project archives.

The construction diary shall be recorded by the foreman of Building No.

It is not only a true portrayal of the daily safe construction of the project, but also the basis for the cause analysis of engineering construction safety accidents.

Maintenance records shall be detailed, including maintenance parts, maintenance methods, maintenance times, maintenance personnel, maintenance results, etc.

5.

Design change, technical approval notice and implementation.

The average temperature can be recorded as XX ℃ – XX ℃, and the weather is recorded in the morning and afternoon respectively.

Be able to accumulate rich experience in writing construction logs.

Construction position.

1、 Basic contents: 1.

Provide reference basis for possible engineering remedial and strengthening measures in the future; 3.

The names, axes and floors of divisional and subdivisional works shall be clearly written at the construction site.

The inspection records are very detailed and can also replace the construction records.

It records the technically valuable things related to construction safety that occur every day during the construction process.

Other inspections, such as civilized construction and site appearance management.

3.

The test block name, floor, axis and number of test block groups shall be indicated.

shall be indicated.

2.

3.

The Construction Safety log is a material formed by daily written records from commencement to completion.

The construction log should be filled in according to the unit project.

2.

The contents of the construction log can be divided into five categories: basic contents, work contents, inspection contents, inspection contents and other contents.

Welding records shall also be recorded in detail, including welding position, welding method (arc welding, electroslag pressure welding, overlapping double-sided welding, overlapping single-sided welding, etc.), welding current, welding rod (flux) brand and specification, welding personnel, welding quantity, inspection results, inspectors, etc.

The main construction contents of the day must correspond to the construction parts.

Technical and quality requirements, opinions and implementation of the construction unit and the supervision unit for the project construction.

4、 Inspection contents: 1.

Filling contents of Safety log 1.

The batch number, quantity, manufacturer and acceptance of incoming materials shall be indicated, and the inspection results after submission for inspection shall be supplemented later.

6.

The concealed contents, floors, axes, subdivisional works, acceptance personnel, acceptance conclusions, etc.

2.

4.

Fabrication of test block.

Power, water and shutdown.

Daily recording shall not be interrupted.

A construction worker who insists on writing construction logs well accumulates a lot of experience a few years earlier than those who do not write construction logs.

2.

Third, pay attention to some details in the filling process.

1.

6.

Promotion and use of special measures, construction methods, new technologies and new materials involved in construction.

Understanding of Safety log construction safety log is a continuous and detailed record of important production and technical activities in the whole construction process by full-time safety officers from the beginning to the completion of the project.

3.

In case of personnel change during the process, handover procedures shall be handled to maintain the continuity and integrity of the construction diary.

Construction machinery failure and treatment.

2、 Work content: 1.

Attendance and operation director.

Construction preparation and implementation of measures in winter and rainy season.

3.

Recording time: from commencement to completion acceptance.

Attendance must be recorded by division of labor, and the total number of workers shall be recorded.

Looking at the construction log written by a construction worker, you will probably know how much water this person has in his stomach, how big his ability will be, and how far he can go.

Timely, truthful and detailed records shall be made.

Round Bar Ferrule

The start and end time of water and power cut must be recorded clearly, what work is being carried out during water and power cut, and whether losses are caused.

The original meaning of “Zhi” refers to the written records.

3、 Inspection contents: 1.

Acceptance of concealed works.

2.

When writing, the handwriting must be neat and clear, and it is best to write in imitation Song typeface or regular script.

In fact, don’t underestimate every small thing, and writing a construction log is not a small thing! What’s your opinion? The main contents of the construction log are: date, weather, temperature, project name, construction position, construction content and main process applied; Arrival and operation of personnel, materials and machinery; Material consumption records and construction progress records; Whether the construction is normal; External environment and geological changes; Whether there is accidental shutdown; Whether there are quality problems; Construction safety; The presence of the supervisor and the certification and signature of the project; Whether there are superior or supervision instructions and rectification, etc.

5、 Other contents 1.

Quality inspection: quality inspection and treatment records of concrete pouring and forming, reinforcement installation and welding, brick masonry, formwork installation and removal, plastering, roof engineering, floor engineering and decoration engineering on that day; Concrete curing records, mixing amount of mortar and concrete admixture; Causes and treatment methods of quality accidents, and effect verification after quality accident treatment.

Date, week, weather and average temperature.

3.

Summarizing afterwards is a very important thing and can accumulate the most experience in the shortest time.

Provide basis for the next process.

Inspection opinions and decisions of relevant leaders, competent departments or various inspection teams on engineering construction technology, quality and safety.

Safety inspection and treatment (correction) of potential safety hazards.

Construction task disclosure, technical disclosure and safety technical disclosure.

2.