If there is rust, that part of the water pipe needs to be replaced.
Finally, the supervisor will also check whether the layout of wires is scientific, neat and orderly.
Secondly, the supervisor will also check the water meter to check whether there will be empty running when the water meter is closed.
2.
In this process, the supervisor only needs to switch on and off the lights and sockets frequently to see the power on and wiring.
They play a role in strictly controlling the construction quality.
If there is empty running, it means that there is water leakage somewhere, which needs to be checked section by section.
Standards for waterway acceptance.
They are required to be closely connected and no leakage is allowed.
Wiring is the most important step in circuit acceptance.
In the whole decoration process, the supervision plays a great role.
When installing hot and cold water pipes, the horizontal hot water pipe shall be installed above the cold water pipe; If it is vertical, the installation method is the left hot water pipe and the right cold water pipe.
The supervisor will also conduct power-off test to see whether the circuit and socket are completely powered off when the switch is turned off.
What are the standards for supervision and acceptance of hydropower? Today, let’s take this question and learn about the supervision and acceptance of hydropower! What are the standards for the supervisor’s acceptance of water and electricity? 1.
The distance between the two pipes is controlled at about 15 cm.
Since different specifications of water pipes play different roles, the supervisor will check whether the use of water pipes meets the standards and whether the installation of cold and hot water pipes is correct during acceptance.
Standards for circuit acceptance during circuit acceptance, supervisors usually take a pen to test the socket switch to see whether each switch and socket is charged and can be used normally.
In addition, the supervisor will also strictly inspect the joints of all pipes and the connections of valves.
In addition, the supervisor will also check whether the meter is installed correctly and whether it can be used normally.
After the water pipe is laid, the supervisor first needs to turn on each faucet to check whether the flowing water quality is clear and free of sundries; Whether the water pipes are connected tightly, and whether there is penetration and blockage.
The direction must be clear and reasonable, so as to avoid electrical accidents, and all wires must wear PVC pipes~~ Recommended reading ~ ~ how to determine the responsibility of each unit in case of “dangerous project” accident? Is it based on these 10 articles that the private life of the project manager on the construction site is chaotic? Do you know earthwork calculation on site..
If the current is unstable, the supervisor will issue a corresponding rectification notice and require the decoration workers to rework.
If there is leakage, the supervisor will check by cutting off power area by area.
In the decoration industry, people in the industry know that if we do not conduct acceptance in time after the decoration is completed, many subsequent processes will be difficult to complete, and owners are prone to various problems when living.