The construction requirements for the bottom sealing of the plastic runway foundation are Youzheng sports 18971153177 plastic runway course material production and sales + supporting professional construction.
The loose asphalt blocks in the foundation can be cleaned and eradicated, and the garbage in the joints can be cleaned and sealed with glue.
2.
Batching: when batching the plastic runway, the construction personnel shall strictly implement the process formula and proportion of the technical department of the plastic runway manufacturer to ensure that the material ratio is accurate.
4.
Joints: in order to ensure the smooth and beautiful joints of the plastic runway, the plastic runway manufacturer suggests that the trimming construction personnel need to check the thickness and flatness of the runway at any time, and make adjustments in time in case of problems.
The products meet the requirements of gb36246-2018 and local standards.
During the construction of the plastic runway, it is necessary to ensure that there are no cracks in the part of the foundation.
Paving: before paving the plastic runway, carefully check whether the foundation of the runway is flat, make corresponding adjustments in time, and lay it in strict accordance with the construction sequence to ensure uniform thickness.
For more information, please consult: 18971153177 sports ground material manufacturer Wu Xinlong (wechat same number) sports ground material manufacturer.
Why is it not conducive to the construction of silicon Pu stadium in winter? The detailed classification and introduction of plastic runway explain the acceptance requirements of silicon Pu stadium! How to accept the silicon Pu stadium? What are the standards? Construction specifications and precautions of silicon Pu stadium, from material, construction to price! Comparison of all kinds of plastic runways! Problems needing attention in the construction process and pavement of plastic runway what should be done well in the plastic runway system? It is very important to lay a good foundation.
This is the back cover process that everyone is familiar with.
When connecting the hard edge, it can be adjusted at any time according to the slope of the foundation.
The company has grade II municipal qualification and can provide customers with bidding Technical service for foundation and surface construction, service hotline: 18971153177 Xiao Wu (wechat same number)! For more details, please visit Wu Xinlong’s official website: http://www.cnpaodao.com/ It is recommended to read the construction process of acrylic stadium.
Trimming: the plastic runway manufacturer believes that the edge connecting part of the runway should be trimmed by designated technicians.
How much do you know about the construction scheme of school EPDM plastic basketball court and sports ground? The detailed classification and introduction of plastic runway explain the construction process and pavement problems of plastic runway in acrylic stadium construction technology school.
When connecting the soft and hard edge, the hard edge of the plastic runway should be cleaned and polished to ensure the firm bonding of the soft edge.
Sports ground material manufacturers specialize in the production of sports stadium, plastic runway and artificial lawn materials..
3.
In addition, Youzheng sports, a plastic runway manufacturer, will share with you the construction requirements of the back cover of the foundation of the plastic runway.
If you like this article, you are welcome to read, forward and share this article, so that friends in need can see this article! More professional knowledge of sports ground related industries such as plastic runway, waterborne silicon Pu stadium, acrylic stadium, artificial grass, suspended assembly floor and ceramic particles can be exchanged with us! ▼ scan the following wechat remarks of manager Wu: consult the playground materials, quotation, bidding, materials, design and construction manager Wu 18971153177 sports ground material manufacturers, specializing in the production of plastic runway, silicon Pu stadium, acrylic stadium and epoxy floor materials.
1.