Details of EPDM plastic site construction

High cost performance: no particles on the surface, easy maintenance and saving management costs.

Each batch of particles may have color difference, so as to avoid color difference affecting the appearance after the site is completed; 2.

Construction technology of breathable plastic runway 1 First, the cement foundation shall be waterproof, and a layer of waterproof material shall be rolled and coated.

5.

It can be used after rain to improve the utilization rate.

All kinds of stones, trees and turf have been installed and planted.

It is suitable for the construction of informal track and field venues in primary and secondary schools.

The construction materials of EPDM plastic site must be mixed evenly to prevent threshing and rubber pimple; 4.

The construction process is simple, in line with international competition standards, and the standard thickness is 13mm.

Strong weather resistance: the special rubber particle surface can resist the pollution of ultraviolet ozone, sulfite and gas and prolong the service life.

The plastic site is the finishing touch of the whole large project.

If you like this article, you are welcome to read, forward and share this article, so that friends in need can see this article! For more professional knowledge of silicon Pu stadium, new national standard plastic runway, plastic runway, EPDM plastic surface, artificial lawn and acrylic stadium, you can consult us! ▼ scan the following wechat QR code of manager Wu.

The construction personnel should pay attention to the leakage of glue, which will pollute the stone and turf; 6.

The paving thickness is 10mm.

Characteristics of hybrid plastic runway: it can be used all day.

Based on the above situation, the construction team with rich construction experience and strong sense of responsibility should be selected for the construction of EPDM plastic site, so as to make the site beautiful and ensure the quality.

5.

Pay attention to the weather conditions in time to avoid rain and snow affecting the site quality; 5.

Lifting Anchor

The construction team should make overall arrangements for time and materials to avoid unnecessary joints; 3.

EPDM plastic construction site has many colors.

It is economical, low price and will not bubble.

3.

The color is green.

EPDM plastic field construction details needing attention Youzheng sports 18971153177 plastic runway course material production and sales + supporting professional construction in recent years, parks, communities and kindergartens have increasingly used plastic as the surface layer, and EPDM plastic field is generally the first choice.

3.

Elasticity: it has moderate elasticity and rebound, which can reduce physical consumption and improve competition results.

It can be used immediately after rain to increase the utilization time and improve the utilization rate of the site.

Features of breathable runway: the bottom layer is made of adhesive bonded waste rubber particles, and the surface layer is sprayed with several particles of polyurethane mixed with Wang glue.

The mixed plastic runway adopts the mixed structure of the new national standard.

The reference ratio is 1:6.5.

The bottom layer of the runway adopts high elastic rubber particles with particle size of 3-4mm mixed with high-strength single component glue.

After 48 hours of curing and maintenance, the site can be marked.

Impact resistance: moderate absorption of foot impact, reduce sports injury, suitable for long-term practice and competition.

The site can be put into use after 15 days of maintenance.

It can maintain a high level of quality in any season and temperature difference.

The reference dosage of waterproof material per square meter is 0.2kg2 Curing and maintenance for 24 hours.

So what details should we pay attention to in the construction process of EPDM plastic site? Details to be paid attention to in the construction of EPDM plastic site 1.

For more information, please consult: 18971153177 plastic runway course material manufacturer Wu Xinlong (wechat same number) sports ground material manufacturer.

Proper elasticity: porous molding material with moderate elasticity and rebound to reduce sports injury.

After the waterproof material is cured, it can be paved.

Remarks: site design, materials and construction integration service manager Wu 18971153177 plastic runway course material manufacturer specializes in the production of plastic runway, new national standard plastic runway, EPDM plastic surface, silicon Pu course, acrylic course, artificial turf and silicon Pu course materials.

Compression resistance: it will not be unable to restore elasticity due to the heavy pressure of track and field equipment..

Stir evenly and pour it into the paver.

Fast construction: due to the use of special materials, the construction does not have high requirements for the weather.

Curing and maintenance for 24 hours.

After the site is paved, the garbage and other residues left by the site shall be checked and cleaned to make the whole site more beautiful.

Professional construction machinery is applied to shorten the construction time.

Weather resistance: it will not fade, pulverize or soften due to UV, ozone and acid rain pollution, and can maintain its bright color for a long time.

Wear resistance: the wear resistance is less than 2.5%, meeting the needs of school principals at all levels for time and high use frequency.

Service hotline: 18971153177 Xiao Wu (wechat same number)! For more details, please visit Wu Xinlong’s official website: http://www.cnpaodao.com/ Breathable plastic runway 1 All weather: maintain a high level of quality in any season and temperature difference.

The service life of breathable plastic can reach more than 6 years.

2.

It can also be used all day.

The breathable plastic runway not only has the advantages of other forms, but also has water seepage and air permeability.

4.

The construction shape of EPDM plastic site is many and irregular, and the use of materials should be calculated in time.

Then mix the same amount of EPDM particles with the same particle size of 1-2mm with the breathable surface material, mix them evenly, pour them into the spraying machine, tilt the spray gun to 60 degrees for spraying in the same direction, and spray again in the opposite direction after 24 hours of maintenance after spraying.

The products meet the requirements of gb36246-2018 and local standards, It can provide partners with bidding assistance, technical guidance for site foundation construction, stadium runway materials, plastic surface construction and other services.

The surface layer is Pu particles or EPDM weather resistant and environment-friendly color particles, and the matrix is full Pu mixed with some rubber particles.

At the same time, it also reduces the investment of foundation funds.

The breathable school runway generally has the color of 13mm for the main runway and 9mm for the thickness of the auxiliary area.

4.