Filling requirements of water conservancy project construction log

Operators, machinery and equipment transferred to the site, utilization, start and end time, etc., to provide basis for cost accounting.

If there is infringement, please contact to delete it.

Record the work arrangement of pre job briefing and the quality, progress and cost control of project nodes.

Source: water conservancy voice Disclaimer: the articles and drawings of this official account are for the purpose of disseminate useful information for the public.

The content is the author’s personal view, for reference only.

10.

The content of this article comes from the Internet and the copyright belongs to the original author.

Parts, contents, existing problems, treatment methods, diagrams and quality control of special construction process of concealed works acceptance.

The official account has the final interpretation power.

The mobilization time, quantity and quality of materials and components, whether there is a certificate and the number of certificates shall be applied for inspection according to the requirements of the supervisor.

The changes of relevant drawings, construction technology and process requirements and the actual implementation on site.

Two Hole Anchor

Time, causes and rectification measures of safety, quality and environmental accidents on the construction site.

Water cut-off, power failure, material waiting, shutdown due to weather, transfer in and transfer out of personnel and mechanical equipment on the site.

Because the official account official has adjusted the push rules, if you want to continue to receive the contents of the public address, please set the public address of the “water conservancy and hydropower database” as the star sign, and more “end looking” and “praise” at the end of the article.

In case of changes in site construction, the project visa shall be made in time and signed by relevant personnel.

Raw material measurement and sampling inspection during on-site prefabrication or pouring of concrete, sampling inspection of concrete mixture, on-site tire support, formwork removal and maintenance, etc.

“If you want to continue to receive the official account, please note that the” WeChat “official account is not a public key.

Click on “set star”, and yellow star will appear next to the official account name (Android and iOS user operation is the same)..

Time and quantity of sampling and inspection of various raw materials and semi-finished products, production time, producer, test results and parts used.

Important on-site construction meetings, technical requirements of relevant units (such as Party A and supervisor) for construction, safety, quality, environment and civilized management requirements, and implementation of pre work and post work meetings.

Star setting: enter the official account homepage, click on the top right corner “…”.

Parts, contents and progress of project construction, quality requirements of important parts, actual construction methods and implementation, self inspection records, technical disclosure and safety technical disclosure, etc.

Main contents to be filled in the construction log: date, weather conditions (including overcast, rainy, sunny, wind, temperature and tide, etc.).