How to construct clean room project? Whole process demonstration

2.

Components and materials of purified air conditioning system (1) the inner surface and built-in parts of purified air conditioning unit shall be made of material surface resistant to disinfection and drug corrosion, and the material surface shall be smooth.

switch and operation status display of air handling system E.

Ceiling (1) the designed ceiling height of the operating room is 2800mm, and the material of the operating room (except the debridement room) is the same as that of the wall.

(2) The clean outer corridor and other auxiliary rooms adopt color steel plate, and the thickness of color steel plate must be in accordance with national standards.

fire prevention alarm I.

(4) The embedded film viewing lamp should be set on the wall opposite to the operator.

(5) The clean corridor adopts high-efficiency air supply and return air.

(4) The corridor is equipped with anti-collision handrails.

1.

2.

The purified air conditioning system shall be set separately from the auxiliary room, and the design parameters shall comply with the provisions of the construction standard of hospital clean operating department.

4.

(2) The clean operating room adopts aluminum alloy spray plastic ceiling air supply device for air supply, and the size of the air supply device shall not be less than Class 100 2.4 * 2.6 and class 10000 1.4 * 2.6 respectively.

It must have the following functions: A.

high efficiency filter discharge system switch and fault alarm h.

2.

3.

The design average illuminance of the operating department shall be above 400lex.

(5) The drug cabinet, instrument cabinet and anesthesia cabinet shall be embedded in a convenient position.

Basic configuration of operation (1) the basic equipment of each clean operating room meets the following requirements.

(4) The clean corridor of aseptic auxiliary room is provided with upper air supply and lower return air, and high-efficiency air supply outlet.

(3) The fresh air system adopts District centralized control and is equipped with a group of fresh air units.

The height of the upper edge of the return air opening shall not exceed 0.5m above and below the ground, and the lower edge of the hole shall not be less than 0.1M from the ground.

The floor (1) of the operation Department is made of anti-static, antibacterial, fireproof and wear-resistant PVC coiled materials.

(9) The wash basin is made of stainless steel; Each wash basin is equipped with a 60L electric water heater, equipped with sensing water nozzle, sensing soap liquid and independent mirror lamp.

4.

Design requirements for purified air conditioner 1 The purified air conditioning system shall keep the clean operating department under control, which can not only ensure the overall control of the clean operating department, but also enable the flexible use of each clean operating room.

shadowless lamp switch and light regulation in operating room g.

(8) The main materials of all configured appliances are made of imported frosted stainless steel, and the quality requirements meet the standards.

Decoration requirements of clean operation Department 1 The wall of the operating department (1) the wall body of the operating room and the clean inner corridor is made of metal materials (electrolytic metal plate or color steel plate) with rust prevention, scrub resistance, acid and alkali resistance, fire prevention, sound insulation and heat preservation, and the wall connection is in the form of arc.

The condensate pipe cannot be directly connected with the sewer pipe.

Air distribution (1) the air supply outlet in the clean operating room shall be centrally arranged above the operating table so that the operating table and its surrounding area are located in the mainstream area formed by the clean air flow.

(5) The materials of muffler silencing parts shall be resistant to corrosion, moisture absorption, dust accumulation and dust production.

The lighting of the operating room is composed of clean gas sealed lighting panel, which is prohibited to be replaced by ordinary lighting panel, and the lighting adopts multi-point control.

clock B.

3.

(4) Differential pressure gauge shall be set before and after all levels of air filters in the unit, and the measuring connecting pipe shall be unobstructed and installed tightly.

5.

The hospital clean room was first used in the operating room, which is what we now call the hospital operating room purification project.

communication system: between operating room and nurse station or other operating rooms The hands-free call intercom (3) embedded medical air source panel in the room shall be set at the lower part of the wall of the operating bed close to the anesthesia machine, and the height from the ground shall be 1m-1.2m.

Each operating room has 380V power supply (single socket is not allowed in the operating room).

2 electrical design requirements 1 The power distribution load of each operating room shall not be less than 8KVA.

The whole is equipped with 12 sensing water nozzles.

4.

Door (1) the entrance door of the operating department, the door of the operating room and the door of the workshop are designed with a light control induction electric door.

Configuration requirements of purification air conditioning unit (1) imported parts are used to assemble medical sanitary purification air conditioning unit in operating room, clean corridor and auxiliary room, equipped with humidifier and dry steam device.

In order to improve the engineering quality of hospital clean room, we must pay attention to both design and construction.

(3) The clean operating room shall adopt the lower return air on both sides.

(2) The splicing joints of coiled materials are welded by hot welding, flat and seamless, and are connected with the wall by circular arc.

(2) The designed ceiling height of corridor and auxiliary room is 2800mm, and the color steel plate ceiling is adopted.

Other doors of the operation Department are designed with an electric door.

I.

various medical gas alarms J.

temperature, humidity and regulation control of purified air conditioning system D.

timer C.

3.

(2) Ten thousand operating rooms are one driven by three.

(7) Combined power socket each operating room is equipped with 10 universal sockets and 2 grounding terminals.

As one of the important functional divisions of the hospital, the quality of the clean room project directly affects the use of the hospital and the treatment of patients.

Plate Bolt Anchor

The multi-functional control system must centrally control all systems in the operating room, and the opening key shall be plane touch type.

(2) The internal structure shall be easy to clean, and the cleaning wastewater can be discharged smoothly, which is not easy to form dust and breed bacteria.

3.

(3) The condensate outlet of the surface cooler shall be equipped with a device that can automatically prevent backsuction and discharge the condensate smoothly under negative pressure.

(6) The infusion guide rail shall be made of ceiling type, located on the ceiling above the operating table, parallel to the long side of the operating table, with a length of more than 2.5m, and the distance between the two rails shall be 1.2m.

lighting system switch F.

detailed explanation of the purification design requirements of the hospital clean operating room, comprehensive and detailed.

(2) The operating room must have a multifunctional control system.

(2) All door jambs are made of stainless steel.

Glass fiber and its products are not allowed to be used as filling materials..

(3) The doors of relevant auxiliary rooms adopt manual doors.

The average illumination of auxiliary rooms and corridors shall be above 200lex.