After the wood wire is processed, the surface shall be sealed with oil as soon as possible, otherwise it will shrink and affect the appearance of the decorative panel.
If you choose to start decoration in spring, you should also reasonably arrange the time.
After the production is completed, the workers should be reminded to complete the oil sealing as soon as possible, so as to cut off the volatilization of water and play a role in later protection.
Generally speaking, there are many wet days in spring in the south, so the floor pavement should pay attention to moisture-proof; In the north, when it is windy and dusty, the paint work should pay attention to the influence of windy and Sandy.
Note that the paint surface should not be too thick.
These are directly related to the expansion of wood.
March and April is the peak decoration season of the year.
During the construction of wood paint, because the wood paint dries slowly and a layer of fog will be generated after the paint absorbs the moisture in the air, blow drying agent is generally used to make the paint dry quickly.
What should be paid attention to during construction? Today, Qi Jiaan will share with you the instructions for decoration construction in spring.
Therefore, attention should be paid to the difference between the north and the south when the decoration is resumed or in spring.
The moisture content of the wood wire used for trimming is higher than that of the decorative panel.
The lining cloth shall be pasted during the treatment of wall base, which can ensure that the wall will not crack.
The curing is generally carried out the next day after laying bricks.
If it is not handled properly, the wall is easy to become moldy and smell.
Moisture proof construction should be carried out in spring, and moisture-proof construction is the most important.
Because the small brick joint itself contains less pointing dose, and the maintenance is not in place or in time, it is very easy to break the floor tile pointing agent, break and fall off the wall pointing agent, and even pulverize.
If the moisture-proof work is not handled well, problems such as wood deformation, floor warping and wall cracks are easy to occur in autumn when the autumn wind blows.
The time of returning to work after the year has entered the spring.
2.
In the season of warm and cold, the climate always hovers between dry, cold and wet.
There are great differences in the precautions for spring decoration between the South and the north.
Don’t worry about moving all the decoration materials into the new house.
It is best to complete all decoration work before the rainy season, so that the house decorated under good weather conditions can better ensure the quality.
The wood products shall be sealed in time.
Gently wipe the brick joint with a clean wet towel to keep the brick joint moist.
The brick joints should also be carefully maintained.
If there is infringement, please contact to delete it.
One year’s plan lies in spring.
7.
The method is very simple.
Do not enter decoration materials in rainy days.
The biggest problem of decoration in spring is humidity.
Latex paint is not easy to dry.
Repair hidden danger in the wet weather of wood in spring, the repair hidden danger of decoration is mainly manifested in plate arching, wood furniture deformation and so on.
All kinds of materials should enter the site in order.
After construction, turn on the air conditioner to dehumidify and completely remove the moisture in the air.
The wall treatment shall be moisture-proof and dehumidification.
4.
There are also maintenance problems after the ceramic tiles are paved and pointed.
After painting, pay attention to ventilation and strive for maximum dryness.
5.
6.
There are differences in the weather between the north and the south.
The weather must be taken into account when the decoration is resumed after the festival.
During the construction of wall coating, the base moisture-proof primer shall be painted well.
If you like this article ▼ please share it with your circle of friends ▼ for more wonderful content, please long press the QR code ▼..
The picture comes from the Internet.
Please check ~1.
Once the wet materials are transported to the construction environment and not fully air dried, they will cause cracking and deformation three months after decoration.
Among them, the south is relatively humid in spring, while the north is more windy sand and soil.
3.
This requires special attention to the selection of materials.
During the paint construction, pay attention to prevent the sand and dust from invading the room and causing the paint to be polluted.
Therefore, the moisture-proof work of decoration materials is particularly important.
If the paint surface is too thick, it will cause paint cracking due to uneven cold and heat inside and outside.
The smaller the brick joints, the more attention should be paid to maintenance.
There is stress on decoration in spring.
The paint shall avoid the paint surface being too thick.
Therefore, the wood used on the construction site cannot be stored in the open air, and after entering the construction site, do not put it next to the air outlet or heating.
Statement: the article only represents personal views and is for learning only.