It is expected to be completed and accepted in June 2025.
It is an important node of Hunan’s national strategy for deep docking of “one belt and one road” and the development of the Yangtze River economic belt.
the next day.
Sanxiang Metropolis Daily Huasheng online, February 4 (correspondent he Hongwei, all media reporter Zhou Ke) during the Spring Festival, the Changsha west railway station project contracted by China Railway 25th Bureau Group ushered in the first blockade construction in the new year.
▲ in order to ensure the smooth progress of the blocking construction of Changsha High Speed Railway west station, the project team based on the on-site exploration and repeatedly optimized the construction scheme.
The builders adhered to the front line, laying a solid foundation for Changyi Changzhou high-speed railway to enter Changsha station through the existing Chang Zhu Tan main line of the intercity railway on March 15 this year.
It is an important hub of the “Xia Yu channel” of China’s “eight longitudinal eight horizontal” high-speed rail network.
Changsha high speed railway project is located in Wangcheng District, Changsha City, Hunan Province.
Changsha west railway station was started in August 2021, with 16 platforms and 30 tracks planned, with a total investment of 3.3 billion yuan.
Chen Shichang, chief engineer of Changsha west station project of China Railway 25th Bureau, introduced: “In order to ensure that the existing main line of Changsha Zhuzhou Xiangtan intercity yard will be used for joint commissioning and joint test before March 15, 2022, we have successively invested more than 300 people and more than 10 sets of large machinery and equipment to jointly promote the project construction in many aspects during the Spring Festival, which provides a favorable guarantee for the smooth opening of the Yiyang Changsha section of Changyi Changzhou high speed railway.” High speed rail high speed rail station in high speed rail and one belt, one road junction, is located at the junction of Changyi high speed rail and Changgan high-speed rail.
“Changsha” After the completion of the project, Changsha will enter the development period of “double high-speed railway hub”, and simultaneously build a national comprehensive transportation hub integrating high-speed railway, subway, urban railway, tram, maglev and urban public transportation.
The operators put into the laying of the station track pipeline and the construction of the OCS foundation of the existing bridge against the cold wind for more than four hours, and successfully completed the blocking construction task by 4:30 a.m.
The main quantities of Changsha west railway station project for blocking construction include: 3 sets of 6 lines, moving lines and reserved 3 sets of 5 lines in Changsha West Railway Station Chang Zhu Tan intercity yard, covering subgrade and ancillary works, bridge and culvert works, track works, houses and ancillary works, comprehensive grounding, station structures and related major and temporary works.
It is adjacent to Wangcheng national economic and Technological Development Zone in the north, Meixi Lake area in the south, Lugu area in the East and Ningxiang Economic and Technological Development Zone in the West.
A new high-speed railway west city will rise in Xiangjiang new area…