We recommend a selection of beautiful articles to our friends every day, hoping to bring you a ray of peace after work.
♩..
♩..
♪~♬..
♩..
♩♫.
♪~♬..
the volume is subject to the actual measured cubic meter, () cubic meter.
♩~♫.
6、 Payment method: one time payment after the project is completed and accepted.
♪..
♪~♬..
Share the ball and praise the ball..
♩~♫.
♪~♬..
♪~♬..
♪~♬..
♩~♫.
♩~♫.
8、 This contract is made in duplicate and takes effect from the date of signature.
♩ Daily reading Study to nourish one’s nature.
♪~♬..
♪~♬..
♩..
♪~♬..
♪..
♪~♬..
♩~♫.
♩~♫.
♪~♬..
♪..
♩♫.
for the speed, quality and safety of the project, the following agreement is formulated through mutual consultation: I.
♪~♬..
5、 Party B must establish the policy of “safety first, prevention first”, strictly implement the safety production responsibility and safety technical operation procedures, eliminate risky and illegal operations, and ensure everyone’s personal safety.
2、 Contract price: the project adopts the form of single package in which Party A only provides cement and sand and Party B is responsible for stone and construction, and it is agreed that ¥ per cubic meter.
Click the blue word to pay attention to us in case of emergency ~ building foundation construction contract Party A: Party B: according to the contract law of the people’s Republic of China, through consultation between Party A and Party B, Party A’s building foundation shall be constructed by Party B.
♩..
3、 Responsibilities of Party A: provide cement and sand in time according to the project progress.
♩~♫.
♩~♫.
♪~♬..
♩..
4、 Responsibilities of Party B: excavation, handling, tamping, mortar masonry firm and flat.
If it is overdue, 5% of the total construction cost shall be deducted as liquidated damages.
♩~♫.
♩..
♩~♫.
Party B shall be responsible for all safety responsibilities during construction, and Party A shall not bear them.
♩~♫.
♪~♬..
♪~♬..
Party A: Party B: mm / DD / yyyy ♪~♬..
♪..
♩..
7、 Construction period: it shall not exceed 16 days from the date of signing the contract.
♩~♫.
project overview.
♩~♫.
The project is located in Chengguan Shangcheng, Wen County, The foundations are strip-shaped, excavated, leveled and compacted, and laid with mortar and stone masonry, with a length of M, a width of M and a height of M.
♩~♫.
♩♫.
♩~♫.
♩~♫.