What are the construction procedures of silicon Pu tennis court?

5.

The EPDM (ethylene propylene diene monomer) rubber particles on the surface layer are mixed and stirred with polyurethane slurry and prepolymer, and then constructed by mechanical spraying.

It will not be hard in winter and soft in summer.

Remarks: technical consultation + product quotation + bidding + material construction! The manufacturer of plastic course runway materials specializes in producing plastic runway, silicon Pu stadium, acrylic stadium, artificial lawn, new national standard plastic runway, breathable plastic runway and EPDM plastic runway materials.

4.

Laying of wear-resistant surface course in the construction process of silicon Pu tennis court: fully mix and mix the material ratio evenly, and lay it on the reinforcing surface, generally two layers.

At present, there is no national standard for breathable plastic runway.

7.

Silicon Pu tennis court construction process site clearing completion: after the completion of tennis court construction personnel, the site shall be cleared.

The products meet the requirements of gb36246-2018 and local standards.

What are the construction procedures of silicon Pu tennis court? Youzheng sports 18971153177 plastic track course material production and sales + supporting professional construction.

During the inspection and testing of relevant national acceptance departments, the acceptance shall be carried out with reference to the relevant standards of IAAF..

There is no need to stop the game in light rain days.

3.

The professional manufacturing process is simple, and the construction period is relatively short.

Source: 18971153177 silicon Pu stadium plastic runway material manufacturer (wechat same number) silicon Pu stadium plastic runway material manufacturer if you like this article, you are welcome to read, forward and share this article, so that friends in need can see this article! For more silicon Pu stadium, acrylic stadium, plastic runway, new national standard plastic runway, breathable plastic runway, EPDM plastic runway and artificial lawn products, welcome to consult manager Wu 18971153177 (wechat same number) ▼ scan the wechat QR code of manager Wu below.

It is an environment-friendly product with breathable function.

The steam pressure cannot gather, so there will be no bubbling.

5.

What are the construction processes of silicon Pu tennis court? 1.

The time interval of each layer shall be subject to the drying and consolidation of the previous layer (generally about 10 hours, depending on the on-site weather conditions) until it is laid to the required thickness.

3.

2.

It meets the professional requirements and has good elasticity.

The surface layer adopts EPDM (ethylene propylene diene monomer) rubber particles to make it highly UV resistant.

The breathable plastic runway of our company adopts the composite structure approved by the IAAF.

Strong power rotation and shock absorption, emphasizing the comfort and safety of athletes, which is helpful for athletes to play or improve their performance.

10.

2.

Emphasize the overall performance of the runway and adapt to various events and long-term competition training.

The data of physical and mechanical properties provided by users and relevant testing departments are implemented with reference to the enterprise standard.

There are many kinds of tennis courts.

Foundation surface treatment of silicon Pu tennis court construction process: clean the court before construction, and the curing period shall not be less than 20 days.

Short Waved Anchor

Features and uses: good fluidity, fast crosslinking speed, environmental protection, good elasticity, easy construction, suitable for mixing with rubber particles.

The color is beautiful, the site is clean and easy to maintain, and the breathable plastic runway construction process is cement concrete or asphalt concrete surface cleaning → dilute acid water to clean cement concrete or asphalt concrete surface → clean cement concrete or asphalt concrete surface again with clean water → measurement Draw the bottom line → apply the cement concrete or asphalt concrete surface layer with PU strong glue → lay and level the paver track → pave the black rubber particle bottom layer → spray glue on the EPDM plastic surface layer → measure and draw the gauge line → clean the surface layer.

Excellent weather resistance, not easy to aging.

Under high temperature, the steam generated by the foundation will be quickly emitted.

Many people mistake Pu tennis courts for silicon Pu tennis courts.

Practice has proved that it has no fading and strong wear resistance.

1.

The reinforcing layer shall be laid in the construction process of silicon Pu tennis court: the rubber scraper shall be laid in two layers, about 0.8mm thick on the elastic surface, and the surface shall be flat and smooth after laying.

Laying the elastic layer in the construction process of silicon Pu tennis court: the flat scraper or tooth scraper shall be laid on the base surface, and the laying thickness of each layer shall not exceed 1.5mm.

4.

We are willing to provide you with high-quality products at reasonable prices.

6.

The company has grade II municipal qualification and can provide customers with technical services for bidding, foundation and surface construction, Service hotline: 18971153177 Xiao Wu (same wechat number)! For more details, please visit the official website of silicon Pu stadium plastic runway material manufacturer: http://www.cnpaodao.com/ Silicon Pu stadium plastic runway artificial lawn knowledge breathable plastic runway breathable plastic runway brief introduction breathable plastic runway, also known as permeable runway, is widely adopted in rainy areas because of its good permeability.

Scribing in the construction process of silicon Pu tennis court: measure and locate according to the standard size, mark the line position with Canvas line, then paste it on the court along the canvas line with textured paper, mix it fully and evenly with special scribing paint in proportion, brush it between the two textured paper with a brush, and tear off the textured paper after the material surface is dry.

The flatness meets the IAAF standard and has good water filtering performance.

Breathable plastic runway features: the bottom layer of breathable plastic runway is a combination of single liquid Pu and elastic rubber particles.

It has become one of the mainstream products of plastic runway surface at present.

The game can be played immediately after heavy rain without ponding.

8.

The upper layer is mixed with PU particles or EPDM weather resistant and environment-friendly color particles, mechanically sprayed, and the lower layer is a cushion cushion paved mechanically.

The elasticity is stable, and there is no difference in elasticity throughout the year.

9.

The painted line is not easy to fall off, with bright color, no fading and better wear resistance.

Meet the training standards of professional track and field athletes.

6.

Breathable runway has the advantages and performance of general runway and low cost.

It is necessary to test the elasticity of the ponding layer after the laying of the tennis court, and pay attention to the ponding layer after the laying of the tennis court.

However, the two materials are different and their construction processes are also different.