The Contractor’s operational, publicity and intellectual materials shall not be used as annexes to the contract text.
3.
The design fee (in words) yuan shall be paid by the employer (this fee is not included in the project price).
Project location:___________________________________________________ 2.
Coordinate with relevant departments to do a good job in site security, fire fighting, garbage disposal and other work, and bear the corresponding expenses.
3.
Both parties shall negotiate on the occurrence and expenses of purchasing on behalf of others.
Article 3 construction drawings both parties agree that the construction drawings shall be provided in the following way: (1) the employer shall design and provide construction drawings in duplicate, one for the employer and one for the contractor.
Article 1.
The annexes to the contract shall come into force after being jointly signed by the employer and the contractor.
The water source and power supply during the construction period shall be provided free of charge for the use of the contractor.
Be responsible for coordinating the relationship between the construction team and the neighborhood to ensure the construction time of the contractor.
5.
Project contents and practices (see Annex).
(1) The Contractor shall contract labor and materials; (2) .
Ensure the cleanliness of the construction site, and be responsible for cleaning the construction site after the completion of the project; 6.
Contract cost: the project cost of the contract is: (in words) yuan.
If any loss is caused, it shall be compensated according to the price.
Article 2 project supervision if the project is subject to project supervision, the employer and the supervision company shall sign a separate project supervision contract and notify the contractor of the name, unit, contact information and responsibilities of the supervision engineer.
Appoint # as the Contractor’s representative on the construction site to be responsible for the performance of the contract.
Obey the management and supervision of government departments and industry competent departments..
It is not allowed to dismantle the indoor load-bearing structure.
During the construction, strictly implement the safe construction operation specifications, fire prevention regulations, construction specifications and quality standards, and complete the works of each stage with quality on schedule (attached table).
Cooperate with the management and supervision of government departments and industry competent departments.
If the employer still needs to use part of the house during construction, it shall be responsible for the security and fire protection of the construction site.
The project duration is days, the commencement date is mm / DD / yyyy, and the completion date is mm / DD / yyyy.
3.
5.
The representative of the employer shall supervise and inspect the project quality and progress, and handle the acceptance, change and registration procedures regularly.
The copy of the contract is invalid.
The contract text shall not be disassembled, added or deleted.
Project overview 1.
The opinions of other members of the employer on the project and the Contractor shall be contacted with the Contractor through the employer’s representative; Be responsible for material mobilization and completion acceptance.
4.
The employer’s address and contact number of the decoration project construction contract and the Contractor’s address and contact number shall be in accordance with the contract law of the people’s Republic of China and other relevant laws In accordance with the provisions of the laws and regulations and in combination with the characteristics of the construction of the building decoration project, Party A and Party B hereby sign this contract on matters related to the decoration project on the basis of equality, voluntariness and consensus, which shall be observed by both parties.
the Contractor shall contract labor and some materials, and the employer shall provide some materials; (3) The contractor contracts labor and the employer supplies materials; 4.
For the project contracting mode, both parties agree to adopt the # contracting mode below.
Handle the relevant formalities of application and registration and property management and bear the expenses, including handling the certificates and expenses of the Contractor’s construction personnel entering the construction site.
Article 5 obligations of the contractor 1.
9.
7.
Strictly implement the national regulations on construction site management, and do not disturb residents and pollute the environment.
Appoint the employer as the on-site representative of the employer to be responsible for the performance of the contract; 2.
6.
If it is necessary to dismantle and modify the non load-bearing structure or equipment pipeline of the original building, it is responsible to go through the corresponding approval procedures with the relevant departments and bear the corresponding expenses.
Including: removing indoor articles and furnishings, or stacking and covering indoor articles that are not easy to handle, in the principle of not affecting the construction.
10.
Click the blue word to pay attention to us in case of need ~ contract No.: Decoration Engineering Construction Contract employer:_____________________________________________________________ Contractor: project address:____________________________________________________________ Project cost:____________________________________________________________ State that the font of the contract must be consistent and shall not be altered.
Before the completion of the project is handed over to the employer, be responsible for protecting all facilities and project finished products on the site.
The employer shall create conditions for the contractor to enter the site for construction before commencement.
(2) The employer entrusts the contractor to design the construction drawings in duplicate, one for the employer and one for the contractor (see the annex).
2.
If terms need to be added, they can be supplemented separately.
Protect the original indoor articles and furnishings and ensure the smooth flow of water supply and drainage pipes.
Article 4 obligations of the employer 1.
4.