Analysis and practical operation of difficult problems of construction contract price

How to deal with the quality problems of the subcontracted project when the employer appoints the subcontractor and the general contractor does not charge the management fee? 28.

Therefore, the calculation of construction cost is very complex and cumbersome, and it takes a long time.

Difficult problems in disputes over the price of the construction contract.

Fixing Socket Waved End Nail Plate

In the fixed unit price contract, the actual quantity of the project far exceeds the estimated quantity.

▲ pay attention to the construction management of Sichuan and obtain the latest construction policies of the whole province ▼ pay attention to the construction management and obtain the latest construction policies of the whole country.

2.

Can the actual constructor directly collect the project funds from the general contractor and the owner? 35.

Course content 1.

Liu, is an associate professor and doctor of the Department of cost management, School of engineering management, Nanjing Audit University.

If the internal contract agreement is deemed invalid, how to deal with the affiliated management fee? 29.

If the construction contract is invalid, can the contractor claim the project payment according to the settlement terms in the construction contract? 31.

If there is no commencement report for the construction project, how to determine the commencement date? 25.

1 Non standard bidding and contract signing before bidding 2 “Back to back” clause, agreement on liquidated damages and return of quality assurance deposit 3 Supplementary principles for missing items 4 Principle and calculation method of engineering quantity adjustment 5 Principles and methods of material price adjustment 6 Project insurance, performance guarantee and other risk prevention contents 7 Principle and pricing method of comprehensive unit price adjustment 8 9.

Its construction process has the characteristics of complex technology, fine division of labor, high degree of socialization, many links and long periodicity.

Mainly engaged in the research of project management, cost management and audit, mainly teaching courses such as project cost management, construction project bidding and contract management, construction and audit regulations, construction project measurement and pricing, construction project audit, project financing, etc..

Project suspension, design change, material price increase and project payment default are very easy to produce the risk of construction contract price.

What circumstances can the contractor claim against the employer during construction? 34.

How should Party B respond to Party A’s refusal to apply for project visa? 27.

The Ministry of housing and urban rural development and the State Administration for Industry and Commerce have formulated the construction project construction contract (model text) (gf-2017-0201), which provides a guarantee for construction enterprises to do a good job in contract management, effectively reduce project risks, safeguard the interests of construction enterprises and increase enterprise profits.

Principles and scope of cost adjustment measures Adjustment principle of impact of construction period change on comprehensive unit price, etc In case of design changes or errors in construction drawings, the contractor has started, cut or purchased materials 11 There are no provisions on the quota, how to define and compensate 12 The terms of the contract are vague and inaccurate 13 There are loopholes in the contract terms, which fail to predict and specify the actual possible situation, and lack some essential terms 14 Project visa management and correct exercise of defense right 15 Nature of valuation specification with bill of quantities and effectiveness of its mandatory provisions 16 Affiliated, illegal subcontracting, internal contracting, expanding labor subcontracting 17 Price determination method, construction period, fluctuation of personnel and machinery price and change of situation 18 Rights and obligations of the actual constructor, authority management of the project manager and identification of apparent agent 19 Some provisions of both parties contain great risks, which are too harsh on unilateral requirements, unbalanced constraints, and even found that some provisions are a trap 20 The subcontractor designated by Party A has breach of contract such as unqualified project quality and delayed project progress 21 Additional expenses incurred due to reduced work efficiency caused by cross interference of multiple contractors at the same construction site 22 Will it be supported for the contractor to claim to settle the project price without the contract on the ground that it is lower than the cost price? 23.

What are the legal risks if the bidder fails to conduct site survey? 26.

Can you revalue it? 24.

If the employer delays settlement or payment after settlement, how can the contractor claim more interest on the project funds? 30.

The difficult problem of construction contract price has attracted more and more attention from all market subjects.

Defects liability system Implied recognition of the application of Law 13 14.

Completion acceptance and warranty Dispute settlement agreed terms 15 Order of interpretation 16 Definition of Party A’s representative director 17 Black and white contract and project quality standard 18 Composition of contract documents 19 Contract price adjustment basis 20 Project series insurance system 21 Project claim expired 22 Project change price 23 Preliminary review of drawing obligations 24 There are contradictions between the terms of the contract.

The construction project has the characteristics of single piece and huge investment.

How can the contractor claim for compensation when the quantities change during the construction and the Contractor does not have the employer’s visa? 33.

If the employer does not handle the project completion settlement for a long time, how to realize the completion settlement amount submitted by the Contractor as recognized? The lecturer, Mr.

Who is responsible for the losses caused by the subcontracting and procurement designated by the employer? 32.

Difficult problem of price from the perspective of 2017 construction contract (model text) 1 Consequences of refusing to sign the contract after winning the bid 2 Quality deposit system 3 Provisional estimate provisional sum 4 Overdue payment of two-stage interest 5 The house is used to offset the project payment and the priority of compensation 6 Mutual guarantee and right of defense 7 Property right transfer certificate system 8 Illegal subcontracting 9 The bidder’s ID card is not uniform, 10 General terms legal status 11 12.

In order to avoid or reduce economic disputes and reasonably determine the project cost, we must strengthen the contract management, clarify the contents and methods of allowable changes in the contract as far as possible, standardize the bidding quotation behavior, conduct a detailed unit price analysis of each unit price in the bill of quantities, and provide a reasonable comparison basis for the reasonable determination of the unit price of project change (including consumption, standard, price, management rate and profit, etc.).