Construction process and technical requirements of outdoor sports floor

Please pay attention to us to provide you with high-quality services.

Adopt professional aluminum alloy buckle for outdoor floor; Both sides (long side) of the floor are buckled to prevent wind and offset; 3.

In places with small flow of people, clean and vacuum every day, and use professional detergent to wet mop regularly; 4.

First, ensure that the base course is solid, flat, clean and dry, remove all sundries that may affect the bonding effect of the two-component adhesive, and that the ground base course is free of structural defects.

Long press the identification QR code and pay attention.

2 at the end where the slotter cannot be opened, please use the manual slotter to slit with the same depth and width; Before welding, the residual dust and debris in the groove must be removed.

2 then roll the floor evenly with a pressing roller of 50 or 75 kg and trim the edge warping at the splice in time; No.3 the excess adhesive on the floor surface shall be wiped off in time to keep the floor surface clean and tidy; After No.

If you like this article, you are welcome to share it with the circle of friends.

If some reference networks violate your relevant rights, please inform us and we will adjust it as soon as possible…

Use a professional slotter to slot along the joint and open a standard “U” groove.

When paint, medicine and other chemicals drop on the product surface, use professional diluent for cleaning; 5.

The same batch of floor should be used in the same area as much as possible; 02 use professional edge trimmer to cut and clean the rough edge of the floor; 03.

In order to make the welding firm, the slotting should not be transparent.

The relative air humidity suitable for construction shall be between 20%-75%; 02 use the moisture content tester to detect the moisture content of the ground base, and the moisture content of the base shall be less than 2%; 03 the strength of the ground base course shall not be lower than the requirement of concrete strength C-20, otherwise, appropriate self leveling shall be adopted to strengthen the strength; 04 the surface hardness of the ground base detected by the hardness tester shall not be less than 1.2 MPa; 05 the flatness of the base course shall ensure that the height drop within the range of 2m ruler is less than 3mm, otherwise the self leveling shall be used for leveling (please strictly carry out the construction according to the self leveling construction standardization process and technical requirements); 06.

Paving of Furong Hengchang PFO outdoor coiled floor – pre paving and cutting 01pfo outdoor coiled floor should be placed on site for more than 24 hours to restore its memory, and the temperature should be consistent with the construction site.

Inappropriate tools and sharp tools shall not be used to scrape or damage the floor surface.

424 hours, the floor shall be grooved and welded.

It is recommended to wear appropriate personal protective equipment (such as goggles, sun hat, labor protection gloves and knee protection) during construction.

In a word, the construction of outdoor special sports floor must ensure that the conditions of the base course in the early stage are met.

The standardized and qualified ground foundation is one of the important links for laying outdoor coiled floor.

The paving of Furong Hengchang PFO outdoor coiled floor – slotting and welding No.1 slotting must be carried out after the adhesive is completely cured.

Pay attention to keep one knife cut to ensure that the overlap of the two floors is seamless.

First, the ground needs to be tested.

Laying and pasting of Furong Hengchang PFO outdoor coiled material floor 01 select professional coiled material adhesive (special adhesive for outdoor floor) and rubber scraper: use 15 cm wide transparent mesh cloth at the ground weld to scrape and bond with the back plate; 02 choose professional outdoor coiled material, double-sided mesh cloth tape and welding method for one side; 03.

Generally, the overlap is required to be 3-5cm.

7 after rain, the accumulated water on the site surface shall be cleaned in time.

When laying the floor, the overlap of the two floors shall be cut by overlapping.

Bolt Anchor

Pavement of Furong Hengchang PFO outdoor coiled floor – after venting and rolling the No.1 floor, first press the floor surface with softwood blocks for leveling and extrude air; No.

High heels and shoes with color loss are not allowed on the field.

3cm buckle pressing plate, with 1.5cm plate expansion gap reserved; Fix the aluminum alloy buckle to the ground with 6mm expansion screw.

The outdoor temperature and ground temperature should be 15-20 ℃, and construction below 5 ℃ and above 35 ℃ is not allowed.

After completion, clean the floor thoroughly or use a vacuum cleaner to remove all residues on the floor; 2.

No.

Cleaning and maintenance of the floor 1.

2.

Please wear special sports shoes on the field during the use of the field.

The ground type is complex, and the treatment of the base course should be cautious.

It is recommended that the slotting depth be 1 / 2 (no more than 1 / 2) of the diameter of the welding line; No.

The surrounding area of the site shall be kept clean to prevent sand and stone debris from entering the site and damaging the floor; 6.

Pavement of Furong Hengchang PFO outdoor coiled material floor – scribing and aluminum alloy buckle 1 to ensure the standard and accuracy of scribing; White engineering line can be selected for fixed-point positioning; PVC raw pulp or weather resistant raw pulp can be selected for line drawing.

Do not use the site within 48 hours after completion; 3.

3 manual welding gun and outdoor special welding line can be used for welding; The temperature of the welding gun should be set at about 350 degrees; No.4 squeeze the welding rod into the opened groove at a proper welding speed at a uniform speed; When the welding rod is half cooled, use the welding rod leveler or monthly cutter to roughly cut off the part of the welding rod higher than the floor plane; No.5 after the welding rod is completely cooled, the remaining convex parts of the welding rod shall be leveled with the welding rod leveler or the monthly cutter.

Pavement of Furong Hengchang PFO outdoor coiled floor – ground base detection 01 use thermometer and hygrometer to detect temperature and humidity.

High concentration solvents such as toluene and banana water and strong acid and alkali solutions shall not be dumped on the outdoor sports surface.