Attendance must be recorded by division of labor, and the total number of workers must be recorded.
Attendance and operation director.
Inspection opinions and decisions of relevant leaders, competent departments or various inspection teams on engineering construction technology, quality and safety.
The technical and quality requirements, opinions and implementation of the construction unit and the supervision unit for the project construction.
Safety inspection and treatment (correction) of potential safety hazards.
It records the daily events related to construction safety in the construction process.
Construction machinery failure and treatment.
3.
The inspection records are very detailed and can also replace the construction records.
Category 2 work content 1.
Basic contents of category 1: date, week, weather and average temperature.
The start and end time of water and power cut must be recorded clearly, what work is being carried out when water and power cut are cut off, and whether losses are caused.
2.
It mainly records the illegal operation, illegal command, safety problems and hidden dangers that have occurred on the construction site, and deals with the problems found.
It is not only a true portrayal of the daily safe construction of the project, but also the basis for the analysis of the causes of engineering construction safety accidents.
Safety log I.
3.
on that day; Concrete curing records, mortar and concrete admixture dosage; Causes and treatment methods of quality accidents, and effect verification after quality accident treatment.
6.
The maintenance records shall be detailed, including maintenance parts, maintenance methods, maintenance times, maintenance personnel, maintenance results, etc.
The main construction contents of the day must correspond to the construction parts.
2.
Construction preparation and implementation of measures in winter and rainy season.
The test block name, floor, axis and number of test block groups shall be indicated.
Acceptance of concealed works.
Power, water and shutdown.
Timely, truthful and detailed records shall be made.
Category 4 inspection contents 1.
4.
understanding of Safety log construction safety log is a continuous and detailed record of important production and technical activities in the whole construction process by full-time safety officers from the beginning to the completion of the project.
2.
It is the proof of whether the equipment and facilities have been accepted and whether the safety and quality personnel have inspected the potential safety hazards on site.
(2) The Construction Safety log is a kind of evidence.
shall be indicated.
Promotion and use of special measures and construction methods, new technologies and new materials involved in construction.
Construction content and actual completion of the day.
Category 5 other contents 1.
The Construction Safety log is a material formed by daily written records from commencement to completion.
Although it seems to be a simple work, there is an investigation on the builder’s sense of responsibility, professionalism and other aspects.
3.
Construction position.
It can accurately, truly and subtly reflect the construction safety situation.
The batch number, quantity, manufacturer and acceptance of incoming materials shall be indicated, and the inspection results after submission for inspection shall be supplemented later.
2.
The construction safety diary has a very important position in the whole project archives.
4.
The average temperature can be recorded as XX ℃ – XX ℃, and the weather is recorded in the morning and afternoon respectively.
2.
In case of personnel change during the process, handover procedures shall be handled to maintain the continuity and integrity of the construction diary.
3.
2.
3.
The concealed contents, floors, axes, subdivisional works, acceptance personnel, acceptance conclusions, etc.
4.
Other inspection records must be specific and detailed, not general.
5.
3.
5.
Category 3 inspection contents 1.
2、 How to record the construction log? First, understand the requirements for filling in the construction log: 1.
Quality inspection: quality inspection and treatment records of concrete pouring and forming, reinforcement installation and welding, brick masonry, formwork installation and removal, plastering, roof engineering, floor engineering, decoration engineering, etc.
The names, axes and floors of divisional and subdivisional works shall be clearly written at the construction site.
Design change, technical approval notice and implementation.
(3) The Construction Safety log is the notepad of the project and the most detailed first-hand information reflecting the construction safety production process.
Main contents of relevant meetings on the construction site.
3.
The construction log should be filled in according to the unit project.
Welding records shall also be recorded in detail, including welding position, welding method (arc welding, electroslag pressure welding, overlapping double-sided welding, overlapping single-sided welding, etc.), welding current, welding rod (agent) brand and specification, welding personnel, welding quantity, inspection results, inspectors, etc.
Positioning of Construction Safety log (1) Construction Safety log is a record.
Third, the details that should be paid attention to in the filling process: 1.
Introduction writing construction log and Safety log is one of the two basic works that builders often contact.
Only when we have an accurate understanding of the Construction Safety log, can we accurately grasp the compilation idea of the Construction Safety log.
Mobilization and inspection of materials.
Next, we summarize the standardized writing methods of construction log and Safety log to teach you how to stand out in your daily work! Construction log I.
Recording time: from commencement to completion acceptance.
Second, the contents that should be recorded in the construction log should be clear: the contents of the construction log can be divided into five categories: basic contents, work contents, inspection contents, inspection contents and other contents.
Fabrication of test block.
When writing, the handwriting must be neat and clear, and it is best to write in imitation Song typeface or regular script.
Construction task disclosure, technical disclosure and safety technical disclosure.
6.
The construction diary shall be recorded by the foreman of Building No.
Daily recording shall not be interrupted.
The original meaning of “Zhi” refers to the written records.
2.
4.
Other inspections, such as civilized construction and site appearance management.
what is construction log? Construction log is a true and comprehensive record of construction organization management, construction technology and other relevant construction activities and changes in site conditions in the whole construction stage of construction project.
(4) The Construction Safety log can serve as a document interface and can be used to trace things that are not in other documents..