People in Xiongxian county should pay attention to detour during road construction

Detour route: South section of Wenquan road and south section of Gucheng road.

In order to effectively alleviate the traffic pressure caused by the construction of some urban roads and reduce congestion, according to the requirements of xiongzhengtong [2022] No.

From May 21, 2022 to September 21, 2022, people’s Street (Wenquan road to Xiongzhou section) was half closed for construction.

From July 1, 2022 to December 31, 2022, half of Xiongzhou Road (Wenchang street to lingdangge Street) was closed for construction.

2.

Detour route: Fuhou street.

4.

From May 21, 2022 to September 21, 2022, Gucheng Road (section from Renmin Street to lingdangge Street) was half closed for construction, driving one way from south to north.

5.

Click to pay attention to “Xiongxian hometown” and present it to you! The notice of the traffic management team of Xiongxian Public Security Bureau on the detour of vehicles during the construction of urban roads.

From May 21, 2022 to September 21, 2022, Yangguang Street (Xiongzhou road to Jiangtai Road section) was cut off for construction.

3.

Everyone needs to contribute to the improvement of urban civilization.

From May 21, 2022 to September 21, 2022, xiongmin Road (Wudaokou Wenchang Street section) was cut off for construction.

Detour route: yagucheng village and qinghedi road.

6, and ensure the safe and orderly passage of the people, combined with the actual traffic conditions of urban roads in our county, it is hereby announced as follows: I.

2、 Control measures: parking spaces on both sides of Xiongzhou Road, Gucheng road and Renmin Street will be cancelled during the construction period, vehicles will be prohibited from parking, and vehicles violating the parking regulations will be punished.

From May 21, 2022 to September 21, 2022, Wenquan Road (section from lingdangge street to Wenchang Street) was cut off for construction.

Detour route: Meteorological street and lingdangge street.

road construction sections and detour routes 1.

From May 21, 2022 to November 21, 2022, Xiongzhou Road (section from lingdangge street to Qinghe bridge of Xiongzhou Road) is half closed.

6.

Detour route: an 8-meter channel is reserved at the intersection of Huaxiong street and xiongmin road.

Ringlock Standard

Detour route: Wenchang street, Huaxiong street, lingdangge street.

Source: Xiongxian people..

I hope you can choose peak shifting and environmental protection travel during this period to contribute to the creation of a civilized county in our county.

Detour route: reserved channel at the intersection of Beiying new village.