In terms of illegal work stoppage, the judicial authority shall be ordered to comprehensively rectify the illegal project safety activities, and the local work unit shall be ordered to stop the bidding according to law.
The leading group of the winning bidder, including the general manager, the person in charge of safety production and the person in charge of technology, shall take turns to the construction site every quarter to inspect the quality of safety production and “concealed works”, focusing on the integrity of the video records of “concealed works”, the standing book of raw materials of “concealed works”, the inspection and testing data Performance of management personnel on duty, etc.
6.
For the cement soil mixing pile project, the construction unit must be equipped with deep-seated automatic monitoring equipment, monitoring platform, automatic cement slurry mixing equipment, cement metering equipment, etc.
to monitor the depth and cement consumption of cement soil mixing pile in real time.
7.
It is hereby printed and distributed to you.
The video data shall be recorded on CD-ROM every week and submitted to the construction unit for long-term storage, which shall be filed together with the construction data.
If the circumstances are serious, they shall be listed in the “blacklist” according to the relevant regulations of the superior.
The construction unit shall regularly adopt the underwater topographic survey system of unmanned ship, and the original survey data must be submitted to the construction unit together with the process data and results for long-term storage.
8.
The supervision unit shall supervise the construction process of important “concealed works” in the whole process and record videos simultaneously.
The construction monitoring data shall be signed by the chief supervision engineer or professional supervision engineer after daily construction and submitted to the construction unit for filing.
The following measures are hereby formulated.
2.
4.
Please implement it carefully.
The dredging construction ships, mud carriers and stone carriers are equipped with ship automatic identification system (AIS system), global positioning system, water level change instrument, video monitoring system and other monitoring equipment.
The monitoring data are signed by the chief supervision engineer and submitted to the construction unit for filing after the daily construction is completed.
For project leaders with a monthly employment rate of less than 80% and chief supervision engineers with a monthly employment rate of less than 26%, their integrity points shall be deducted and publicized in accordance with relevant regulations.
The legal person of the bidder is required to provide quality management measures, quality assurance and commitment in the whole process of important “concealed works” in the bidding document, which will be used as an important basis for bid evaluation and award.
Important “concealed works” must be subject to whole process video monitoring, and each important “concealed works” working face shall not be less than 2 monitors.
Informatization measures, comprehensively improve the quality management level of “concealed works” of government investment projects, and provide a strong guarantee for Zhuhai to improve the quality and safety level of urban construction and fully promote the construction of modern international special economic zones with Chinese characteristics in the new era.
For the construction sites of municipal and water conservancy projects, UAV aerial photography is used to generate orthophoto images every half a month and submitted to the construction unit for long-term storage.
1.
Face recognition and attendance shall be conducted for project managers through the real name management system.
The project and personnel who violate the relevant regulations shall be recorded for bad behavior and deducted points for integrity, and the illegal acts shall be punished.
5.
It is hereby notified.
1、 Video monitoring shall be carried out during the whole construction process and real-time measurement and monitoring equipment shall be installed (I) the whole process video monitoring must be carried out for important “concealed works”, and there shall be no less than 2 monitoring for each important “concealed works” working face.
After the inspection, the inspectors shall be responsible for signing the inspection results, and the inspection records shall be submitted to the construction unit for filing for future reference, which shall be used as the basis for the implementation of responsibilities..
(responsible unit: the construction unit and the construction unit) II.
3.
Source: Zhuhai Municipal Bureau of housing and urban rural development recently issued several measures on further improving the quality management of “concealed works” of government investment projects, which will be implemented from the date of promulgation.
Video monitoring equipment shall be set up for the tunnel project according to the excavation progress to ensure that the operation monitoring in the tunnel is in place.
If the circumstances are serious and suspected of violating the law, their practice qualification shall be suspended in accordance with the law.
(responsible unit: the construction unit) (III) strengthen the supervision of dredging, underwater riprap and other water construction.
(responsible unit: construction unit) (II) for the cement soil mixing pile project, the construction unit must be equipped with deep automatic monitoring equipment, monitoring platform, automatic cement slurry mixing equipment, cement metering equipment, etc.
For the important raw materials of “concealed works”, the use account must be established separately, the incoming raw materials must be accessed separately, the material warehouse must be set up with separate video monitoring, and the video monitoring shall be carried out 24 hours.
The construction and supervision unit shall verify the implementation of concealed works and the implementation of measures and costs through aerial photography.
The leading group of the winning bidder shall take turns to lead the inspection and implement the main quality responsibility.
Notice of Zhuhai Municipal Bureau of housing and urban rural development on printing and distributing several measures on further improving the quality management of “concealed works” of government investment projects (zjzg [2022] No.
to monitor the depth and cement consumption of cement soil mixing pile in real time.
1) all relevant units: with the consent of the Municipal People’s government, in order to ensure that the supervision of “concealed works” is guided by the rule of law, documented, accountable and in place, and comprehensively improve the quality management level of “concealed works” of government investment projects, Our bureau has formulated several measures on further improving the quality management of “concealed works” of government investment projects.