Harbin is under closed construction for 28 days. This is a detour

At present, the road and bridge and traffic police departments have temporarily added traffic warning signs to guide people to pass.

The planned construction period is 28 days.

Please note that from 22:00 on March 16, the Harbin Road and bridge management department will carry out the repair and construction of the ramp wall of the lower bridge at the northwest entrance of the turntable of the Armed Police Hospital of Xinkang viaduct in Daoli District.

In addition, the closed off ramp of the lower bridge is adjacent to the auxiliary road under the bridge, temporarily occupying a carriageway, which is easy to cause traffic congestion.

Highlight: news night flight hotline: 0451-82898289 business cooperation: 18646368811 recorded by: Wang Yan editor: zhengbohuan chief editor: qibingxin reviewer: Liu Bing unified planning: lijianhong Supervisor: shendexin likes to share 👍 It is better to read the article..

Please try to choose other routes for passing vehicles to bypass.

Tips from the traffic police department: vehicles passing through the second ring road to the airport and Qunli can bypass the bridge entrance of Anyang Road; Vehicles heading for the west railway station can detour from Hexing road to Qiaokou and Xuefu Road; Vehicles from Jiangbei to Xinyang Road and Tongda street in Daoli District can choose Hayao road to bypass the bridge mouth in advance.

The full text is 383 words, and it takes about 58 seconds to read.

During this period, the off bridge ramp traffic at the northwest entrance (north-south direction of the Second Ring Road) will be temporarily closed.

Lifting Anchor